Laserfiche WebLink
EXHIBIT `B ' <br /> COST ESTIMATE -BENT PINE LIFT STATION UPGRADES <br /> LIFT STATION. `A' <br /> DESCRIPTION QUANTITY UNIT UNIT PRICE <br /> REMOVE/REPLACE PUMPS 2 1 LS $ 18,000. 00 <br /> CONTROL PANEL/ELECTRICAL 1 LS $ 14,000.00 <br /> DIESEL GENERATOR/TRANSFER 1 LS $353000. 00 <br /> SWITCH <br /> MISC. CONCRETE/FENCE/GATE 1 LS $ 7,500. 00. <br /> PIPE/FITTINGS.AT WET WELL 1 LS $ 31000. 00 <br /> FORCE MAIN 1 LS $ 51500.00 <br /> MODIFICATIONS/CONNECTION <br /> LANDSCAPE 1 LS $ 2 ,000.00 <br /> SUBTOTAL: $85,000.00 <br /> LIFT:STATION`B' <br /> DESCRIPTION QUANTITY UNIT UNIT PRICE <br /> REMOVE/REPLACE PUMPS 2 1 LS $ 18 ,000.00 <br /> CONTROL PANEL/ELECTRICAL 1 LS $ 14,000. 00 <br /> DIESEL GENERATOR/TRANSFER 1 LS $35,000.00 <br /> SWITCH <br /> MISC. ;CONCRETE/FENCE/GATE I LS $ 7,500.00 <br /> PIPE/FITTINGS. AT WET WELL 1 LS $ 33000, 00 <br /> FORCE MAIN 1 LS $ 5 ,500.00 <br /> MODIFICATIONS/CONNECTION <br /> LANDSCAPE 1 LS $ 29000. 00 <br /> SUBTOTAL :. . $85 000.00 <br /> LIFT STATION `A' $ 85 000.00 <br /> LIFT STATION °B' $ 859000.00 <br /> STAKE=OUT/AS'=BUILTS $ 81000,00 <br /> CONTINGENCY (10%) $ 17,800,00 <br /> TOTAL : $ 195,800.00 <br />