My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-338C.
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-338C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2017 1:48:56 PM
Creation date
9/30/2015 10:11:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/03/2006
Control Number
2006-338C.
Agenda Item Number
7.G.G.
Entity Name
Bridge Design Associates, Inc.
Subject
Bridge over Range Line Canal-Work Order No. 2
Area
8th St. east of 74th Avenue
Project Number
03107-B
Supplemental fields
SmeadsoftID
5879
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t r � VO � � tO <br /> �Z <br /> Board of County Commissioners. <br /> 1810 25th Street <br /> Vero Beach, Florida 32960 <br /> Telephone : (772) 567-8000 <br /> FAX: 772-778-9391 <br /> WORK ORDER NO. 2 (Engineering) <br /> FOR <br /> PROFESSIONAL BRIDGE DESIGN SERVICES AGREEMENT <br /> FOR ANNUAL BRIDGE DESIGN SERVICES CONTRACT <br /> WITH <br /> Bridge Design Associates , Inc. <br /> Indian River County Project No . 03107 -B <br /> This Work Order No . 2 is in accordance with the existing AGREEMENT dated October 3 , 2006 <br /> between Bridge Design Associates , Inc. (ENGINEER) and Indian River County (COUNTY) . <br /> This Work Order No. 2 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> Bridge over Range Line Canal on 8th Street east of 74th Avenue <br /> SECTION II — SCOPE OF SERVICES <br /> This Work Order No . 2 is for providing the design of a three- lane bridge, utilizing as many <br /> pre- cast components as possible to minimize the disruption and inconvenience to the users . <br /> The bridge will be located in the current location . Indian River County will provide a typical <br /> section of the proposed road connections . <br /> SECTION III - TIME FOR COMPLETION <br /> 60 Calendar days from notice to proceed . <br /> SECTION IV — COMPENSATION <br /> The COUNTY agrees to pay, and the ENGINEER agrees to accept, a fee for services <br /> rendered according to the " Scope of Services " identified in Section II and III of this Work <br /> Order No . 1 , a Lump Sum of $ 32 ,050 .00 . <br /> C :ADocurnents and SettingsVAdministratorALs al Setiings\Ternffemporary Directory 2 for BRIDGEDFSIGNEAGREEMENT-08-23- <br /> 06.zipABCCBridgeDesign W orkOrderN208-28-06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.