Laserfiche WebLink
CONCEPTUAL CONSTRUCTION COST ESTIMATE <br /> BIOSOLIDS DEWATERING FACILITY AT THE IRC LANDFILL <br /> Unit Capital Operations <br /> Price Units Cost / Price Cost / Price <br /> Site Work $75,000 LS $ 75, 000 <br /> Grease and Septage Offloading Area (2) $15,000 2 $30, 000 <br /> Grease and Septage degritting and deragging <br /> (Communiter and Pumps) $22,000 3 $66,000 <br /> IRC Tanker truck offloading area $15,000 1 $15,000 <br /> Three 100kga1 sludge storage tanks Glass Lined Steel <br /> (GLS) w/ dome lid $135, 000 3 $405,000 <br /> Mixers for sludge storage tanks $4,500 6 $27,000 <br /> Odor Control for Storage Tanks (Biocube or Ozone <br /> Headspace) $150,000 1 $150,000 <br /> Sludge Transfer Pumps to Centrifuge $14,000 3 $42,000 <br /> Centrifuges (2) $392,000 2 $784, 000 <br /> Centrate Ground Storage Tank Bolted Steel (0 . 5 Mgal) <br /> GLS w/ dome $260, 000 1 $260,000 <br /> Cake Conveyor to Sludge Loadout area $100,000 1 $100,000 <br /> Centrate / Wastewater Lift Station / FM to 74th Ave . $80,000 1 $80,000 <br /> Generator for Class I reliability $275,000 1 $275,000 <br /> Miscellaneous $125,000 1 $125, 000 <br /> Yard Piping $80, 000 1 $80, 000 <br /> MCC room, Small Laboratory, Bathroom with Shower $65, 000 1 $65,000 <br /> Chemical Tank and Pump Skid for Phosphorus <br /> Removal $45,000 1 $45,000 <br /> Subtotal $1 , 740,000 $884,000 <br /> Instrumentation (10 % ) $174,000 $88,400 <br /> Electrical (15 % ) $261 , 000 $132,600 <br /> Subtotal $2, 175 , 000 $1 ,105 ,000 <br /> Contingency (15 % ) $326,250 $165 , 750 <br /> Total Estimated Construction Cost $2,501250 $1 , 270 ,750 <br /> A-11 mh2200. doc <br />