My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-357
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2016 12:18:35 PM
Creation date
9/30/2015 9:23:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/01/2005
Control Number
2005-357
Agenda Item Number
11.J.3
Entity Name
Camp Dresser & McKee Inc.
Subject
Work Order No. 2 Biosolid
Supplemental fields
SmeadsoftID
5258
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> Activities performed under this phase include the following tasks : <br /> TASK 1 . 0 - PRELIMINARY DESIGN <br /> This task will include conducting a Design Preferences Workshop with IRC; performing <br /> topographic survey; performing geotechnical services; establishing necessary process design <br /> criteria; establishing preliminary mechanical, electrical, instrumentation, structural, civil, and <br /> architectural criteria; identification of specific permitting requirements; preparation of a <br /> preliminary design level opinion of probable cost; preparation and submittal of a preliminary <br /> design report (PDR) ; conducting a PDR review meeting, preparation and submittal of a final <br /> PDR; and coordination with IRC' s staff. <br /> Specific products of this task include a Geotechnical (Soils) Report, Topographic Survey, Design <br /> Preferences Workshop Letter Report, Preliminary Site Plan and a PDR . <br /> Subtask 1 . 1 - Design Preferences Workshop <br /> CDM will prepare and conduct a Design Preferences Workshop with IRC Utilities and Solid <br /> Waste Disposal District staff to obtain equipment and facility preferences including <br /> architectural and site aesthetics issues . The primary goal of the Workshop is to minimize facility <br /> design alternatives analysis and expedite the PDR preparation schedule . CDM staff to attend <br /> will include Client Officer, Project Manager, Lead Project Engineer, and the design leaders for <br /> the architectural, civil, process engineer, landscaping, structural, electrical, HVAC / plumbing <br /> and instrumentation disciplines . <br /> Subtask 1 . 2 - Geotechnical Investigations <br /> CDM will provide the following services related to geotechnical (soil) investigations through a <br /> Subcontractor : <br /> 1 . Perform preliminary subsurface explorations at the IRC Landfill site, necessary for the <br /> development of design criteria for the anticipated structures . A maximum of 8 borings at <br /> depths ranging from 30 to 100 feet has been assumed . <br /> 2. Perform standard penetration tests and split-spoon sampling within the borings at <br /> regular intervals . <br /> 3 . Perform classification tests on selected samplings obtained from the borings . <br /> 4 . Visually classify soil samples in general accordance with the United Soil Classification <br /> System and prepare Test Boring Records . <br /> 5 . Summarize the results of the geotechnical investigations and provide recommendations <br /> for surface preparation and design of the proposed structures . <br /> Subtask 1 . 3 - Topographic Surveys <br /> CDM will provide the following services related to topographic survey through a <br /> Subcontractor : <br /> A-2 mh2200. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.