My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-055
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:28:33 PM
Creation date
9/30/2015 10:35:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2007
Control Number
2007-055
Agenda Item Number
7.P.
Entity Name
Ardaman & Associates, Inc.
Subject
Work Order No.3 8th St. Bridge
Area
8th St. Bridge at 74th Ave.
Project Number
03107-B
Supplemental fields
SmeadsoftID
6126
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County EXHIBIT „ " -2 <br /> - <br /> Proposal File No . 07-64-3147 <br /> We recommend that the project surveyor locate our borings horizontally and vertically ( i . e . , <br /> determine the elevation of the ground surface at the boring locations). This information will <br /> increase the accuracy of the data obtained . <br /> LABORATORY TESTING <br /> Routine laboratory visual classification will be performed along with specific classification tests <br /> deemed necessary (i . e . , sieve analysis , Atterberg limits and organic contents). <br /> ENGINEERING ANALYSIS AND REPORT <br /> Engineering analysis of all data obtained will be made to evaluate general subsurface conditions <br /> and to develop geotechnical engineering recommendations to guide site preparation and <br /> foundation design criteria for the bridge . For our analysis , we will require specific loading <br /> conditions for the bridge . Our recommendations as discussed above , together with all the data <br /> developed during the exploration will be submitted in a written report upon conclusion of the <br /> exploration . <br /> COST ESTIMATE <br /> The costs associated with the aforementioned tasks are presented below. Unit rates were obtained <br /> from the continuing services contract between Indian River County and Ardaman and Associates , <br /> Inc. If subsurface conditions are encountered during our field explorations that necessitate <br /> advancing the SPT borings to greater depths , the client understands and agrees to pay the <br /> additional drilling cost of $ 13 . 25 per foot. <br /> 1 . Initial Site Visit, Layout of Boring Locations , <br /> Coordination of Field Work : <br /> Senior Project Engineer - 1 hour @ $ 98 .00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . $ 98 . 00 <br /> Project Engineer - 2 hours @ $ 85 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . $ 170 .00 <br /> Senior Field Technician - 4 hours @ $ 48 . 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . $ 192 .00 <br /> 2 . Mobilization/Demobilization of Drilling Equipment <br /> 1 Mobilization @ $ 175 .00/Mob . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . $ 175.00 <br /> 3 . Standard Penetration Test Borings : <br /> (2 borings to 60 feet) <br /> 50 feet of borehole at depths <br /> less than 25 feet @ $ 11 .00/foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . $ 550 .00 <br /> 50 feet of borehole at depths <br /> 26 to 50 feet @ $ 12 . 00/foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . $ 600 .00 <br /> 20 feet of borehole at depths <br /> 51 to 75 feet @ $ 13 .25/foot . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . $ 265 . 00 <br /> Ardaman & Associates, Inc. <br /> 1111111111111110% <br />
The URL can be used to link to this page
Your browser does not support the video tag.