Laserfiche WebLink
Attachment 3 <br /> ESTIMATED COST OF IMPROVEMENTS <br /> FORCE MAIN <br /> IN 65TH STREET FROM OLD DIXIE TO WEST PROPERTY LINE <br /> 4/10/2006 <br /> ITEM DESCRIPTION QUANTITY UNIT OF UNIT PRICE TOTAL PRICE <br /> MEASURE <br /> Sewer Force Main <br /> 1 MOT 1 LS $ 22500 .00 $2 ,500 .00 <br /> 2 Mobilization 1 LS $ 51000 .00 $5 ,000 .00 <br /> 3 16 X 6 Tap Sleeve & Valve 1 EA $ 4 ,500 .00 $4,500 .00 <br /> 4 Restore Pavement & Sod 1 LS $ 12000 .00 $1 ,000 .00 <br /> 5 14" Jack & Bore w/ 6" FM 108 LF $ 350 .00 $37, 800 .00 <br /> 6 6" Gate Valve 4 EA $ 750 .00 $3,000 .00 <br /> 7 6" PVC Force Main 2689 LF $ 25 .00 $67, 225 .00 <br /> 8 6" HDPE Directional Bore 120 LF $ 150 . 00 $18, 000 .00 <br /> 9 4" Gate Valve 3 EA $ 500 . 00 $ 1 , 500 .00 <br /> 10 6 X 4 Tee 3 EA $ 700 . 00 $2 , 100 . 00 <br /> 11 4" Plug 2 EA $ 200 . 00 $400 . 00 <br /> 126" Plu 1 EA $ 300 . 00 $300. 00 <br /> 13 Sod Right of Way 2689 LF $ 3 . 50 $9,411 . 50 <br /> 14 ITesting 1 LS $ 3 ,000 . 00 $3,000. 00 <br /> Total $ 155,736 . 50 <br /> Contingent @10% $ 15, 573 .65 <br /> Survey $3, 500 .00 <br /> Design $ 107000 .00 <br /> Permitting $5,000 .00 <br /> Bidding & Award $2 ,000 .00 <br /> Services during constuction $5,000.00 <br /> Administration $ 1 , 500 .00 <br /> Total $ 1982310 . 15 <br /> Attachment 3 <br />