Laserfiche WebLink
Attachment 1 <br /> (Scope of Work) <br /> Scope of Services <br /> Schulke, Bittle & Stoddard, L.L.C. will provide services including surveying, engineering <br /> design, preparation of Construction Plans, preparation and submittal of permit <br /> applications, construction administration and periodic construction field inspection for <br /> the proposed project that will provide for the construction of approximately 4, 132 linear <br /> feet of master planned 6" P.V .C . Sanitary Sewer Force Main and associated <br /> appurtenances to be located on 650 St. , from Old Dixie Hwy, west to Lateral ` G ' Canal <br /> (See Exhibit "A" for location and Exhibit `B" for cost tabulation). <br /> The estimated construction cost of this project is $256,615.40 <br /> In order to execute this project in the most cost effective manner with the most aggressive <br /> schedule, Schulke, Bittle & Stoddard, L.L.C. is using the following sub-consultants : <br /> • Houston, Schulke, Bittle & Stoddard, Inc . for the route survey. <br /> • KSM Engineering & Testing, Inc. for soil boring and testing information. <br /> Attachment 1 <br /> Work Order No. 3 with Schulke, Bittle & Stoddard, L.L.C . <br /> Pg. 1 of I <br />