Subtask 1 . 3 CDM will prepare an engineering analysis report with supporting <br /> documentation to demonstrate plant re-rate capacity and additional unit process <br /> requirements . CDM will prepare and submit five copies of the report for IRC <br /> review and comment. Once comments are received and incorporated, CDM will <br /> provide five copies of the final engineering analysis report. <br /> Subtask 1 . 4 CDM will review related facility operations at the South County Wastewater <br /> Treatment Plant. Services in this subtask include, but are not limited to, <br /> evaluations of current operations, recommendations to improve operations, and <br /> overall system evaluation. <br /> TASK 2. 0 PERMITTING ASSISTANCE <br /> This task provides for the preparation of necessary permit applications, meetings, and <br /> negotiation with regulatory agencies and preparation of responses to Requests for Additional <br /> Information (RAI) . This task will only be completed upon favorable results from Task 1 . 0 and <br /> with the Utility Director's authorization. <br /> CDM will prepare applications for permits as required and related to this project. Permit- <br /> related work shall include furnishing required data, drawings, and other information requested <br /> and assisting IRC to obtain required permit approvals . CDM will submit permit applications to <br /> IRC for review and meet with IRC as required to discuss the review comments . CDM will revise <br /> the applications as required and submit to appropriate regulatory agency for review and <br /> approval. IRC will provide all permit application fees applicable to the effort. The permit to be <br /> obtained includes the following: <br /> ■ FDEP will require a permit to re-rate the plant process . It is likely that the process will <br /> require IRC to renew the existing permit. FDEP Forms 62-620 . 910 (1 ) and (2) will be <br /> prepared and submitted along with applicable documentation including: <br /> 1 . The most recent capacity analysis report, if required by Chapter 62-600, FAC <br /> 2. An operation and maintenance performance report pursuant to Chapter 62-600, FAC <br /> 3 . A process flow diagram showing the current status and current capacity of the facility <br /> 4 . A site plan showing the current operations and unit processes <br /> 5 . Copies of binding agreement with property owners utilizing reclaimed water of effluent <br /> on property not owned or under direct control of the permittee . <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br /> The following list of items is not included in this Scope of Services but will be addressed in <br /> separate proposals or will be negotiated separately with IRC, if required : <br /> A . Excavation for field verification of the actual locations of existing underground utilities <br /> and structures . If field verification is necessary, excavation shall be provided by IRC as <br /> directed by CDM . <br /> A-2 mh2015.doc <br />