My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-082
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 2:48:16 PM
Creation date
9/30/2015 9:34:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/14/2006
Control Number
2006-082
Agenda Item Number
11.I.1.
Entity Name
Creech Engineers, Inc.
Subject
Professional Surveying and mapping services
Area
CR 510 to Concha Avenue-City of Sebastian
Project Number
0390 2005-2006
Supplemental fields
SmeadsoftID
5513
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laconia Street Route / Design Survey Project Specific No. 0523 <br /> Proposal for Professional Surveying Services <br /> Revision 2 <br /> 23101 .02 (00) <br /> March 6, 2006 <br /> Page 2 of 4 <br /> Task 2 — Primary Control <br /> • Primary Horizontal Control — CEI will establish a horizontal control network using <br /> Static GPS methods. The network will meet the FDOT4 requirements for Primary <br /> Horizontal Control based on the FDOT4 Memorandum titled FDOT DISTRICT IV <br /> GLOBAL POSITIONING SYSTEM SURVEY STANDARDS FOR HORIZONTAL <br /> NETWORKS, dated April 11 , 2003. CEI Crews will reconnoiter published horizontal <br /> control surrounding the project corridor. CEI will recover existing FDOT4 horizontal <br /> control from the C. R. 510 project. <br /> • Primary Vertical Control - CEI will establish a Vertical Control Network using 3-wire <br /> differential leveling technique relative to the NGVD29 elevations for the benchmarks <br /> provided by the COUNTY. The network will also be adjusted relative to the NAVD88 <br /> based on published NGS and FDOT4 values for local control. The network will meet <br /> the FDOT4 requirements for Primary Vertical Control based on the current FDOT <br /> Location Survev Manual. <br /> Task 3 — Survey Baseline <br /> • CEI will establish a survey baseline the length of the corridor for the project relative <br /> to the west line of Section 25, Township 31 South Range 38 East. <br /> Task 4 — Locations <br /> • All structures and improvements will be located within 200' east of the east canal <br /> bank of the Lateral "C" Canal running along the west section line from the southern <br /> project limits north to the Saint Sebastian River ( South Prong ). <br /> • All structures and improvements will be located within the RNV of Laconia Street, <br /> within 80 feet west of the west RNV, and within 25 feet east of the east RNV of <br /> Laconia Street from the north side of the Saint Sebastian River (South Prong) north <br /> to the project limits and east +/- 150 feet along Concha Avenue within limits of RNV. <br /> Specifically this will include the finished floor elevations of houses along the corridor <br /> and improvements within Lot 1 Block 364 of Sebastian Highlands Unit 11 <br /> • CEI will locate only the limits of the orange groves within these limits. Ground <br /> measurements will be made within the grove rows sufficient only to provide a typical <br /> row profile. <br /> Task 5 — Cross Sections <br /> ■ Cross sections every 100' will be located within 200' east of the east canal bank of <br /> the Lateral "C" Canal running along the west section line from the southern project <br /> limits north to the Saint Sebastian River ( South Prong). Also cross sections every <br /> 100' will be located within the RNV of Laconia Street, within 80 feet west of the west <br /> R/W, and within 25 feet east of the east RNV of Laconia Street from the north side of <br />
The URL can be used to link to this page
Your browser does not support the video tag.