Laserfiche WebLink
ATTACHMENT 1 to WORK ORDER NO 3 <br />ADDITIONAL ENGINEERING SERVICES RELATED TO THE EGRET <br />MARSH REGIONAL STORMWATER PARK <br />SCOPE OF WORK <br />Services included in this Work Order are those associated with redesign of certain facilities <br />of the Egret Marsh Regional Stormwater Park so that Phase I of the project may be <br />competitively bid and constructed. The Phase I construction budget is $4 million. As a <br />minimum, Phase I will include an offsite pump station, a stormwater force main, an Algal <br />Turf Scrubber® stormwater/canal water treatment system, and pertinent components. The <br />CONSULTANT's services will include Phase I engineering design and computer aided <br />drafting as necessary to provide detailed construction drawings and accompanying <br />technical specifications for the CONSULTANT's portion of the project, i.e. the Algal Turf <br />Scrubber® system and its pertinent components. <br />In its performance of services as detailed within this Work Order, the CONSULTANT may <br />provide information, including engineering drawings and calculations that are considered <br />proprietary to the CONSULTANT. COUNTY agrees to use such information only to <br />evaluate its interest in purchasing from the CONSULTANT, the installed process known as <br />the Algal Turf Scrubber® or ATSTM, for the specific site application, and only the specific <br />site application, as contemplated within this and previous Work Orders. <br />**END OF ATTACHMENT 1 ** <br />Page 2 <br />of 4 <br />C:�Docaments and SettingsAPalmer\Local <br />Settings\Tempomry <br />Internet Files\OLK8iHydromentia <br />Work Order 43.doc <br />