My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-056
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 1:30:24 PM
Creation date
9/30/2015 10:35:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/13/2007
Control Number
2007-056
Agenda Item Number
7.Q.
Entity Name
Ardaman & Associates, Inc.
Subject
Work Order No.4 13th St. SW Bridge
Area
13th St. SW Bridge at 58th Ave.
Project Number
0530-B
Supplemental fields
SmeadsoftID
6127
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ardaman & Associates , Inc . <br /> Gee r _ nvi onr cr:� <br /> Nrafer6tc rsueants January 31 , 2007 <br /> Proposal File No . 07-64-3146 <br /> " All <br /> Indian River County <br /> Board of County Commissioners FEB 0 2 2007 <br /> Engineering Division <br /> 1840 25" Street INDIAN NI4 �zh *OUNTY <br /> Vero Beach , Florida 32960-3365 ENGIMEERI t'G ; DlV;SION <br /> Attention : Mr. Michael D . Nixon , P . E . <br /> Subject: Proposal for Subsurface Soil Exploration and <br /> Geotechnical Engineering Evaluation <br /> 13`h Street Bridge at 581h Avenue <br /> Indian River County, Florida <br /> Gentlemen : <br /> As requested , we are pleased to present the following proposal for conducting a subsurface soil <br /> exploration and geotechnical engineering evaluation forthe subject project. This proposal presents <br /> our approach to the project which was discussed with your project structural engineer, Bridge <br /> Design Associates, Inc . and includes an estimate of field exploration and laboratory testing <br /> quantities as well as geotechnical engineering services needed for the evaluation of the data <br /> obtained and preparation of a report. <br /> We understand that the project will consist of replacing the existing 13' Street bridge with a new <br /> bridge supported on prestressed drive concrete piles. <br /> The following summarizes our proposed scope of work and associated fees for conducting the <br /> subject exploration . <br /> FIELD EXPLORATION <br /> As requested , our field program will include conducting two Standard Penetration Test ( SPT) <br /> borings , one at each end of the proposed bridge to a depth of 60 feet . The borings may be <br /> completed to shallower (or deeper) depths depending on the soil conditions encountered during <br /> the performance of the borings . The SPT borings will be drilled using a procedure similar to the <br /> Standard Penetration Test outlined in ASTM D- 1586 . The borings will be sampled at 18-inch or <br /> 24-inch intervals to 10 feet deep and at 5 -foot intervals below 10 feet. Each sample will be <br /> removed from the sampler in the field and then examined and visually classified by our crew chief. <br /> Representative portions will be sealed and packaged for transportation to our laboratoryforfurther <br /> analysis as required . Water level observations will be made in the boreholes during the drilling <br /> operation . <br /> 480 Concourse Pace [AV ri Ur,! i Fort r _ud-a. Flonds 34986, Pirone (772) 879- j079 FFJ_ ; 772) 978-0007 <br /> Offices In: Bartow Cocoa, Fort 1A,yers, Warm. Orlando, Port Charlotte, Pc r St, Lucie. Sarasoia, Tallahassee. Tampa, `A:. Palm Beacl'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.