BRIDGE DESIGN ASSOCIATES, INC. <br /> 56TH PLACE OVER NORTH RELIEF CANAL <br /> July 25, 2007 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A ' <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REP/ HOURS COST <br /> ACTIVITY E.I. BY BY <br /> ACTIVITY ACTIVITY <br /> $130.50 $110.20 $89.90 $62.35 <br /> Pre-Construction Meeting 2.0 2.0 4.0 $385.70 <br /> Shop Drawing Reviewes / concrete <br /> mix, test pile, re-cast components 2.0 8.0 8.0 18.0 $1 ,641 .40 <br /> Pile Casting / Sheet Piles 48.0 48.0 $2,992.80 <br /> Pile Driving 80.0 80.0 $4,988.00 <br /> Pile Caps 32.0 32.0 $1 ,995.20 <br /> Prestressed Placement / Closure Pour 24.0 24.0 $1 ,496.40 <br /> Post Tensioning 2.0 2.0 48.0 52.0 $3,474.20 <br /> Sidewalks 24.0 24.0 $1 ,496.40 <br /> Barriers 24.0 24.0 $1 ,496.40 <br /> Approach Slab 16.0 16.0 $997.60 <br /> Approach Slab sidewalks 16.0 16.0 $997.60 <br /> Approach Slab barriers 32.0 32.0 $1 ,995.20 <br /> Revetment I Slope Protection 16A 16.0 $997.60 <br /> Final Inspection 2.0 2.0 4.0 $385.70 <br /> Final Rep2d & Certfication 2.0 1 2.0 $261 .00 <br /> TOTAL MANHOURS 10.0 10.0 0.0 372.0 392.0 <br /> DIRECT LABOR COST $1 ,305.00 $1 ,102.00 $0.00 $23, 194.20 $25,601 .20 <br /> ENGINEERING FEES $25,601 .20 <br /> PDA TEST $4,600.00 <br /> 06-625 pro cps TOTAL $30,201 .20 <br />