My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-283A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-283A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 2:30:25 PM
Creation date
9/30/2015 11:05:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/04/2007
Control Number
2007-283A
Agenda Item Number
7.WW.
Entity Name
Bridge Design Associates, Inc.
Subject
Work Order No. 4 56th Bridge over I.R.F.W.C.D. North Relief Canal
Construction P
Supplemental fields
SmeadsoftID
6520
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE DESIGN ASSOCIATES, INC. <br /> 56TH PLACE OVER NORTH RELIEF CANAL <br /> July 25, 2007 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A ' <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REP/ HOURS COST <br /> ACTIVITY E.I. BY BY <br /> ACTIVITY ACTIVITY <br /> $130.50 $110.20 $89.90 $62.35 <br /> Pre-Construction Meeting 2.0 2.0 4.0 $385.70 <br /> Shop Drawing Reviewes / concrete <br /> mix, test pile, re-cast components 2.0 8.0 8.0 18.0 $1 ,641 .40 <br /> Pile Casting / Sheet Piles 48.0 48.0 $2,992.80 <br /> Pile Driving 80.0 80.0 $4,988.00 <br /> Pile Caps 32.0 32.0 $1 ,995.20 <br /> Prestressed Placement / Closure Pour 24.0 24.0 $1 ,496.40 <br /> Post Tensioning 2.0 2.0 48.0 52.0 $3,474.20 <br /> Sidewalks 24.0 24.0 $1 ,496.40 <br /> Barriers 24.0 24.0 $1 ,496.40 <br /> Approach Slab 16.0 16.0 $997.60 <br /> Approach Slab sidewalks 16.0 16.0 $997.60 <br /> Approach Slab barriers 32.0 32.0 $1 ,995.20 <br /> Revetment I Slope Protection 16A 16.0 $997.60 <br /> Final Inspection 2.0 2.0 4.0 $385.70 <br /> Final Rep2d & Certfication 2.0 1 2.0 $261 .00 <br /> TOTAL MANHOURS 10.0 10.0 0.0 372.0 392.0 <br /> DIRECT LABOR COST $1 ,305.00 $1 ,102.00 $0.00 $23, 194.20 $25,601 .20 <br /> ENGINEERING FEES $25,601 .20 <br /> PDA TEST $4,600.00 <br /> 06-625 pro cps TOTAL $30,201 .20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.