Laserfiche WebLink
Indian River Countv Sector 3 - Beach Restoration Project <br /> Additional Services Scope of Work <br /> As part of this effort, COASTAL TECH will : <br /> • investigate and obtain available "reprints of published journal papers that support <br /> or validate the accuracy of SBEACH modeling in predicting the sub-aqueous <br /> beach profile change, and/or support the practice of using SBEACH modeling to <br /> predict the adjusted equilibrium beach fill profile", <br /> • perform a "statistical analysis (following Foster or Dean) to verify if . . . model <br /> results are within acceptable limits . " <br /> • assess "cross-shore spreading of the Sector 1 &2 constructed beach fill into an <br /> equilibrated beach fill profile . . . . given the hurricane impacts of 2004 . . . from <br /> analysis of the monitoring data." <br /> • "revise Figures A6a and A61i to include the predicted equilibrium profile used in <br /> the design and permitting of Sector 1 &2 (ATM, 2002)", <br /> • "provide separate figures for the proposed restoration of the 1972 and 1986 beach <br /> and dune conditions " with "a vertical marker of the landward edge of hardbottom <br /> and . . . the distance from the reference monument" <br /> • identify the location of the equilibrium toe of fill (ETOF) in the Project Area . <br /> Task le — Storm Damage Reduction Benefit Analysis: COASTAL TECH will conduct <br /> a qualitative storm damage reduction benefit analysis using the SBEACH cross-shore <br /> model. Up to four (4) different return interval storms (eg . 15-yr, 25-yr, 50-yr, 100-yr) <br /> will applied to the representative profiles within the Project Area . The SBEACH model <br /> will be applied to assess (i) the limits of erosion for each return interval storm event, and <br /> (ii) the number of upland structures impacted with and without the design alternative(s). <br /> Task If —Hardbottom Impacts : Based upon the hardbottom maps generated in <br /> conjunction with Part 1 services , COASTAL TECH will assess potential impacts of the <br /> proposed Project upon existing hardbottom (area) including the area of hardbottom <br /> expected to be impacted. COASTAL TECH will revise the Design Document to reflect <br /> the updated hardbottom impact analysis . <br /> Task lg — Revised Permit Sketches : COASTAL TECH will revise the Permit Sketches <br /> to "provide superimposed plots of the 1972 beach-dune profile and the proposed <br /> construction template at each FDEP reference monument and note the fill density at that <br /> reference monument" with "the landward edge of the exposed hardbottom from the most <br /> recent hardbottom mapping", with "a vertical marker of the landward edge of hardbottom <br /> and . . . the distance from the reference monument" , and the limits of the adjusted fill as <br /> determined from other tasks. The plan views shall include the "ETOF, dune (existing and <br /> proposed), MHWL, and structures (existing and proposed)". The cross-sections shall <br /> include the "predicted ETOF and the MHW elevation". <br /> Task lh — Design Document: COASTAL TECH will revise the Design Document and <br /> JCP application to include results of Part 1 and Part 2 work with a recommended design . <br /> COASTAL TECH will meet with the COUNTY to present and review the updated Draft <br /> Design Document; COASTAL TECH will subsequently make revisions as required by <br /> the COUNTY and provide fifteen ( 15 ) copies of the Design Document to the COUNTY. <br /> The Design Document will be presented to the Beach Committee by COUNTY staff. <br /> Page 12 of 14 <br /> June 13. 2007 <br />