My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-151
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 1:39:02 PM
Creation date
9/30/2015 10:47:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/01/2007
Control Number
2007-151
Agenda Item Number
11.J.2
Entity Name
Schukle, Bittle, & Stoddard
Subject
Work Order No.4 Master Planned Water Main
Area
Vero Lakes Estate
Supplemental fields
SmeadsoftID
6285
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> (Scope of Work) <br /> Scope of Services <br /> Schulke, Bittle & Stoddard, L. L.C . will provide services including surveying, <br /> geotechnical exploration, engineering design, hydraulic analysis/model of the Master <br /> Planned 12" Water Main and future water main grid/network in Vero Lake Estates, <br /> preparation of Construction Plans, preparation and submittal of permit applications, <br /> construction administration and periodic construction field inspection for the proposed <br /> project that will provide for the construction of approximately 24,930 If of 12" P. V . C . <br /> and H .D .P.E . Master Planned 12" Water Main and associated appurtenances to be located <br /> and constructed along the following route : <br /> - Connection is made to a 20" D. I .P. water main at the southeast corner of <br /> CR512 and 104'hAve . intersection. <br /> - On 104'' Ave. ; from CR512 south 1300 if to 93 `d St. <br /> - On 93rd St. ; from 104th Ave, east 3201f to 103 `d Ct. <br /> - On 103`d Ct. ; from 93`d St. , south 2735 if to 891h St. <br /> - On 89th St. ; from 103`d Ct. , west 335 If to 104th Ave . <br /> - On 104th Ave. ; from 89th St. , south 66051f to 791h St. <br /> - On 79th St. ; from 104th Ave, east 86501f to 9151 Ave . <br /> - On 915` Ave. ; from 79th St. , north 4335 If to 85" Pl . <br /> - On 85th Pl . ; from 915` Ave., east 650 if to 90th Ave (CR510) <br /> - Connection is made to a 16" D. I .P . water main at the southwest corner of 85th <br /> Pl. and 90th Ave (CR510) intersection. <br /> See Exhibit "A" for location and Exhibit "B" for cost estimate. <br /> The estimated construction cost of this project is $ 2 ,040,712.72. <br /> In order to execute this project in the most cost effective manner with the most aggressive <br /> schedule, Schulke, Bittle & Stoddard, L.L. C. is using the following sub-consultants: <br /> • Houston, Schulke, Bittle & Stoddard, Inc. for the route survey. <br /> • KSM Engineering & Testing, Inc. for soil boring and testing information. <br /> Attachment 1 <br /> Work Order No. 4 with Schulke, Bittle & Stoddard, L.L.C . <br /> Pg. 1 of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.