My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-151
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2016 1:39:02 PM
Creation date
9/30/2015 10:47:29 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> (Scope of Work) <br /> Scope of Services <br /> Schulke, Bittle & Stoddard, L. L.C . will provide services including surveying, <br /> geotechnical exploration, engineering design, hydraulic analysis/model of the Master <br /> Planned 12" Water Main and future water main grid/network in Vero Lake Estates, <br /> preparation of Construction Plans, preparation and submittal of permit applications, <br /> construction administration and periodic construction field inspection for the proposed <br /> project that will provide for the construction of approximately 24,930 If of 12" P. V . C . <br /> and H .D .P.E . Master Planned 12" Water Main and associated appurtenances to be located <br /> and constructed along the following route : <br /> - Connection is made to a 20" D. I .P. water main at the southeast corner of <br /> CR512 and 104'hAve . intersection. <br /> - On 104'' Ave. ; from CR512 south 1300 if to 93 `d St. <br /> - On 93rd St. ; from 104th Ave, east 3201f to 103 `d Ct. <br /> - On 103`d Ct. ; from 93`d St. , south 2735 if to 891h St. <br /> - On 89th St. ; from 103`d Ct. , west 335 If to 104th Ave . <br /> - On 104th Ave. ; from 89th St. , south 66051f to 791h St. <br /> - On 79th St. ; from 104th Ave, east 86501f to 9151 Ave . <br /> - On 915` Ave. ; from 79th St. , north 4335 If to 85" Pl . <br /> - On 85th Pl . ; from 915` Ave., east 650 if to 90th Ave (CR510) <br /> - Connection is made to a 16" D. I .P . water main at the southwest corner of 85th <br /> Pl. and 90th Ave (CR510) intersection. <br /> See Exhibit "A" for location and Exhibit "B" for cost estimate. <br /> The estimated construction cost of this project is $ 2 ,040,712.72. <br /> In order to execute this project in the most cost effective manner with the most aggressive <br /> schedule, Schulke, Bittle & Stoddard, L.L. C. is using the following sub-consultants: <br /> • Houston, Schulke, Bittle & Stoddard, Inc. for the route survey. <br /> • KSM Engineering & Testing, Inc. for soil boring and testing information. <br /> Attachment 1 <br /> Work Order No. 4 with Schulke, Bittle & Stoddard, L.L.C . <br /> Pg. 1 of I <br />
The URL can be used to link to this page
Your browser does not support the video tag.