Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC. <br /> 53RD STREET OVER LATERAL "H" CANAL <br /> July 25, 2007 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A" <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REP/ HOURS COST <br /> ACTIVITY E.I. BY BY <br /> ACTIVITY ACTIVITY <br /> $130.50 $110.20 $89.90 $62.35 <br /> Pre-Construction Meeting 2.0 2.0 4.0 $385.70 <br /> Shop Drawing Reviewes / concrete <br /> mbc test pile, re-cast components 2.0 16.0 8.0 26.0 $2,523.00 <br /> Pile Casting / Sheet Pile 112.0 192.0 $6,983.20 <br /> Pile Driving 56.0 56.0 $3,491 .60 <br /> Pile Caps 16.0 16.0 $997.60 <br /> Prestressed Beams *48.048.0 $2,992.80 <br /> CIP Slab 8.0 $2,378.00 <br /> Median $498.80 <br /> Sidewalks $997.60 <br /> Banters $997.60 <br /> A roach Slab $997.60 <br /> Approach Slab sidewalks $997.60 <br /> Approach Slab barriers 16.0 16.0 $997.60 <br /> Slope Protection 16.0 16.0 $997.60 <br /> Final Ins ectton 2.0 2.0 4.0 $385. 70 <br /> Final Report & Certification 2.0 2.0 $261 . 00 <br /> TOTAL MANHOURS 8.0 24.0 0.0 372.0 404.0 <br /> DIRECT LABOR COST $1 ,044.00 $2,644.80 $0.00 $23, 194.20 <br /> =$26,883.00 <br /> ENGINEERING FEES $26,883.00 <br /> PDA Test $4,000.00 <br /> 05-623 pro cps TOTAL FEES $30,883.00 <br />