Laserfiche WebLink
ATTACHMENT A <br /> SCOPE OF PROFESSIONAL SERVICES <br /> INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT <br /> ENGINEERING SERVICES FOR <br /> ANNUAL PERMITTING SERVICES - 2006 <br /> PROJECT UNDERSTANDING <br /> Each year Indian River County (IRC) Solid Waste Disposal District (SWDD) is required to <br /> document environmental compliance in accordance with several different permits. CDM assists <br /> SWDD with some of these submittals to the Florida Department of Environmental Protection <br /> (FDEP) each year . In addition to an assignment involving converting of the construction <br /> Environmental Resource Permit (ERP) to an operations permit, the entire stormwater system <br /> will be reviewed to determine compliance with the permit documents and the engineer will <br /> certify the system as being complete. <br /> This project is to provide permitting services which are required including: <br /> ■ Task 1 .0 - Full Cost Accounting <br /> o Task 2.0 - Financial Assurance <br /> ■ Task 3 .0 - General Technical Assistance <br /> CDM will coordinate with the SWDD in order to provide timely execution of each portion of <br /> this project. <br /> TASK 1.0 - FULL COST ACCOUNTING STUDY AND REPORT FOR FISCAL YEAR 2004-05 <br /> Under provisions of Chapter 62-708 .300(3), Florida Administrative Code (FAC), IRC SWDD is <br /> required to determine and publicly disclose the full cost of solid waste management within its <br /> service area for Fiscal Year 2004-2005 . <br /> CDM will prepare a report setting forth the full cost of solid waste management for Fiscal Year <br /> 2004-2005 in accordance with the requirements of Chapter 62-708, FAC. CDM will also prepare <br /> a draft public notice based on the full cost of solid waste management in SWDD for Fiscal Year <br /> 2004-2005. <br /> CDM will provide a draft report and public disclosure notice to SWDD by March 23, 2005 <br /> assuming receipt of all data required to perform the study by March 12, 2005 . <br /> After receipt of comments, CDM will submit the final report and public disclosure notice within <br /> 7 calendar days . SWDD is required to advertise this public disclosure notice in a local <br /> newspaper by the end of March. <br /> TASK 2.0 - FINANCIAL ASSURANCE <br /> SWDD operates a Class I landfill through a contract with Waste Management Inc . and operates <br /> a Construction and Demolition (C&D) Debris Landfill facility . The permitted Waste Tire <br /> A-1 mn225.aoc <br />