Laserfiche WebLink
Table 4 <br /> BUDGET ESTIMATE <br /> COMPLIANCE MONITORING REPORTING AND OTHER <br /> TECHNICAL SUPPORT SERVICES <br /> CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY <br /> INDIAN RIVER COUNTY, FLORIDA <br /> TASK 04: TIER 2 TESTING AND REPORTING <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> COST <br /> a. Principal Hr $185 0 $0 <br /> b. Associate Hr $160 20 $3,200 <br /> c. Senior Project Engineer Hr $142 16 $2,267 <br /> d. Project Engineer Hr $ 109 0 $0 <br /> e. Engineer Hr $89 0 $0 <br /> f. Senior Staff Engineer Hr $82 90 $7,341 <br /> g. Staff Engineer I Hr 1 $68 0 $0 <br /> Subtotal Professional Servicesl $12,808 <br /> a. CADD Designer Hr $95 :rviE <br /> b. Drafter/CADD Operator/Artist Hr $54 <br /> c. Technical/Administrative Assistant Hr $70 <br /> d. Technical Word Processor Hr $66 <br /> e. Clerical Hr $42 <br /> Subtotal Technical/Administrat <br /> a. Lodging Day $75 0 $0 <br /> b. Per Diem' Day $21 0 $0 <br /> c. Communications Fee 3% Labor 0.03 $14,2171 $427 <br /> d. CADD Computer System Hr $ 15 8 $ 120 <br /> e. Vehicle Rental' Day $75.00 2 $ 150 <br /> f. 8"x11 " Photocopies Each $0.12 500 $60 <br /> g. CADD Drawings Each $3 0 $0 <br /> Subtotal Reimbursables $757 <br /> OWN X- 40014MMMIN" N PREM <br /> a. NMOCs by EPA Method 25C Sample $ 160 3 $480 <br /> b. Nitrogen by EPA 3C Sample $ 110 3 $330 <br /> c. Stainless Steel Canister Rental Each $ 105 3 $315 <br /> d. Sampler Rental Each $30 3 $90 <br /> Subtotal Analytical Costs $1 ,215 <br /> In compliance with Section 112.061 F.S. <br /> XL06096/Revised Budget-Estimate xis GeoSyntec Consultants <br />