Laserfiche WebLink
Board of County Commissioners <br /> 4 1840 25th Street <br /> Vero Beach, Florida 32960 <br /> * * Telephone: (772) 567-8000 <br /> '�LORI�Q' FAX: 772- 7784391 <br /> WORK ORDER NO . 6 <br /> FOR <br /> PROFESSIONAL SURVEYING SERVICES AGREEMENT <br /> FOR ANNUAL SURVEYING AND MAPPING SERVICES CONTRACT NO 0390 <br /> WITH <br /> Masteller, Moler & Reed , Inc . <br /> This Work Order No . 6 is in accordance with the existing AGREEMENT dated September Z <br /> 2003 between Masteller, Moler & Reed, Inc. (SURVEYOR) and Indian River County <br /> (COUNTY) . This Work Order No . 6 amends the agreement as follows : <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No. 6 is for the SURVEYOR to perform a route survey and topogrgaphic <br /> survey for Storm Grove Road and the Grand Harbor Brine property located in Indian River <br /> County and lying in a portion of Sections 14 and 15 , Township 32 South, Range 39 East . The <br /> route survey will include Storm Grove Road and the FDOT ditch right-of-way from t rLie east end <br /> of Bent Pine Development to the aforesaid Grand Harbor Brine property. <br /> SECTION H - SCOPE OF SERVICES <br /> As agreed upon between Masteller, Moler & Reed, Inc . and Indian River County, Masteller, <br /> Moler & Reed, Inc . will perform the following Professional Land Surveying services <br /> 1 ) Establish survey baseline as direct.e y the engineer . <br /> 2) Locate all monumentation for establishment of existing rights of way, including St rm Grove <br /> Road, Lateral "G" Canal, Florida East Coast Railway, Old Dixie Highway, U . S . Highway No . 1 <br /> and the FDOT ditch rights of way. <br /> 3 ) Locate and identify all visible topographic features along the route . (i. e . : power po les, <br /> mailboxes, pavement, culverts, etc .) <br /> 4) Obtain elevations along the route sufficient for engineering design purposes. <br /> 5 ) Obtain limited elevations on Brine property to establish a 400 foot grid across prol erty. <br /> 6) Stakeout up to 20 soil borings locations as directed by the engineer. <br /> 7) Elevations will be based on NGVD 1929 unless otherwise directed . <br /> 8) Prepare and provide five paper copies and one digital file of route survey upon completion of <br /> field work. <br />