Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC. <br /> 16TH STREET BRIDGE OVER 74TH AVENUE <br /> July 25, 2007 <br /> HOURLY BREAKDOWN OF SERVICES <br /> EXHIBIT "A" <br /> PROJECT PROJECT CADD FIELD TOTAL LABOR <br /> MANAGER ENGINEER TECH REP/ HOURS COST <br /> ACTIVITY E.I. BY BY <br /> ACTIVITY ACTIVITY <br /> $130.50 $110.20 $89.90 $62.35 <br /> Pre-Construction Meeting 2.0 2.0 4. 0 $385.70 <br /> Shop Drawing Reviewes / concrete <br /> mix, test pile, re-Cast components 2.0 8.0 8.0 18. 0 $1 ,641 .40 <br /> Pile Casting / Sheet Piles 50.0 80.0 $4,988.00 <br /> Pile Driving 40.0 40.0 $2,494.00 <br /> Pile Cas 16.0 16.0 $997.60 <br /> Prestressed Placement / Closure Pour 12.0 12.0 $748.20 <br /> Post Tensioning 2.0 2.0 12.0 16.0 $1 ,229.60 <br /> Sidewalks 8.0 8.0 $498.80 <br /> Barriers 16.0 16.0 $997.60 <br /> Approach Slab 16.0 16.0 $997.60 <br /> Approach Slab sidewalks 16.0 16.0 $997.60 <br /> Approach Slab barriers 24.0 24.0 $1 ,496.40 <br /> Revetment & misc. pipes 16.0 16.0 $997.60 <br /> Final Inspecfion 2.0 2.0 4.0 $385.70 <br /> Final Report & Certification 2.o 7.A $zsl .00 <br /> TOTAL MANHOURS 10.0 10.0 0.0 268.0 288.0 <br /> DIRECT LABOR COST $1 ,305.00 $1 ,102.00 T <br /> $0.00 $16,709.80 $ 19, 116.80 <br /> ENGINEERING FEES $19, 116.80 <br /> PDA Test $4,000.00 <br /> 05-624 pro cps TOTAL $23, 116.80 <br />