Laserfiche WebLink
Subtask 1.5 Drafting <br />All of the tasks previously stated will be drafted into AutoCAD drawings that will overlay the <br />current datum used by the landfill. We expect this task to be an iterative task to follow the <br />stormwater modeling and the airspace balancing tasks. <br />PROJECT SCHEDULE <br />The site plan will be developed within 6 weeks of notice to proceed. <br />A-2 mnzaoe doc <br />