My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-135
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 11:01:30 AM
Creation date
9/30/2015 9:40:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2006
Control Number
2006-135
Agenda Item Number
11.J.3.
Entity Name
Camp Dresser & McKee, Inc.
Subject
Work Order No. 6-North County Water Treatment Plant Expansion
Supplemental fields
SmeadsoftID
5603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2. 0 Coordination with Property Owners <br /> CDM will meet with SWCD board members to identify the wells to be monitored <br /> (approximately 14 wells) . Once identified, CDM will coordinate with property owners to obtain <br /> permission to sample the wells on a monthly basis for approximately 24 months. CDM will also <br /> schedule sampling events with each owner and provide notice on a monthly basis in advance of <br /> sampling. <br /> Task 3. 0 Sampling <br /> CDM will sample the 14 private wells, the 3 County production wells, and the 3 County <br /> monitoring wells on approximately the same day each month throughout completion of the <br /> construction phase of the expansion project (approximately 24 months) . It is anticipated that all <br /> wells/ parameters can be sampled in a single day each month (approximately 8 hours) . <br /> Task 4. 0 Data Summary and Presentation <br /> CDM will establish a database and tabulate the monthly data gathered. Upon completion of the <br /> monitoring program, CDM will provide the County with trends of the sampled parameters and <br /> water levels, identify any adverse trends, and provide suggested further monitoring as the <br /> expansion project is placed into service. CDM will compile a letter report to include the data <br /> and trends and provide five copies of the letter report to the County . <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br /> CDM intends to rely solely on the accuracy of the field probes for parameter measurements. <br /> CDM will not contract with a laboratory for further analysis. If laboratory analysis is required, <br /> CDM will negotiate additional services and budget with the County . <br /> This authorization does not include: <br /> ■ Monitoring services after the expansion is complete and the new facilities are on line <br /> ■ Recommendations for mitigation if the new facilities are found to adversely impact <br /> neighboring users <br /> ■ Permit modifications or negotiations with SJRWMD regarding mitigation <br /> COUNTY RESPONSIBILITIES <br /> The County will assist in gaining permission to sample any and all County-owned wells <br /> included in the monitoring program. This will include on and off site raw water supply wells, <br /> on and off site WTP monitoring wells, and any wells located on County-owned property such <br /> as golf courses and fairgrounds. <br /> A-2 mh2440.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.