Laserfiche WebLink
Table 2 <br /> BUDGET ESTIMATE <br /> THREE YEARS OF MPIS AND GROUNDWATER PLUME <br /> MONITORING AND REPORTING <br /> SOUTH GIFFORD ROAD LANDFILL <br /> TASK 2 : Groundwater Sampling <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> BUDGET <br /> a. Principal hr $ 185 0 $0 <br /> b. Associate hr $ 160 0 $0 <br /> c. Senior Project Engineer hr $ 142 0 $0 <br /> d. Project Hydrogeologist hr $ 10912 51 ,305 <br /> e. Engineer hr $ 89 0 $0 <br /> f. Senior Staff Geologist hr $ 82 450 $36,707 <br /> g. Staff Engineer hr $68 0 $0 <br /> Subtotal Professional Services $38,011 <br /> a. Site Manager,/Construction Manager hr $81 420 $34, 104 <br /> b. Senior CADD Operator hr $91 0 $0 <br /> c. Drafter/CADD Operator hr $54 0 $0 <br /> d. Technical/Administrative Assistant hr $70 0 $0 <br /> e. Technical Word Processor hr $66 0 $0 <br /> f. Clerical hr $42 0 $0 <br /> Subtotal Technical/Administrative Service $34,104 <br /> a. Lodging day $95 42 $3,990 <br /> b. Per Diem day $21 84 % 1 ,764 <br /> e Communications Fee 3% labor 0.03 $72, 115 $2, 163 <br /> d. CADD Computer System hr $ 15 0 $0 <br /> e. Vehicle Rental week $275.00 6 $ 1 ,650 <br /> f. 8 .5"x11 " Photocopies each $0. 12 0 $0 <br /> g. Overnight Cooler each $95.00 6 $570 <br /> h. Groundwater Sampling Kit day $275.00 42 $ 11 ,550 <br /> i. Water Level Measurement Kit day $53 . 75 6 5323 <br /> j. Equipment Shipping each $54. 00 6 $324 <br /> g. Film and Development each $25 6 $ 150 <br /> Subtotal Reimbursables $221484 <br /> ERMI <br /> Notes: <br /> 1 . Groundwater Sampling Kit includes: water level indicator, oil/water probe, peristaltic or bladder pump, <br /> multi-meter (pH, temperature, conductivity, turbidity, dissolved oxygen, and oxidation reduction potential), <br /> tubing, and miscellaneous supplies. <br /> 2 . Water Level Measurement Kit includes: water level indicator and miscellaneous field supplies. <br /> XR07014/1R70003.x16 Geowntec Consuhants <br />