Laserfiche WebLink
Indian River County .2- <br /> Proposal File No. 07-64-3268 <br /> Geotechnical Emineerino Services: <br /> 1 . Engineering Technician (boring layout): 1 hour @ $42 .00Ihour . . . . . . . . . . . . . . . . . . . . . . $ 42.00 <br /> 2. Auger Borings: 12 linear feet @ $9.00/foot. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . $ 108.00 <br /> 3. Engineering Services & Report Preparation : <br /> Project Engineer; 1 .5 hours @ $98.00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br />147 .00 <br /> CADITechnical Draftsman; 1 hour @ $40.00/hour. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 40 .00 <br /> Secretary; 1 hour @ $40. 00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . $ 40.00 <br /> Construction Materials Testing Services: <br /> 4. In-Place Density Tests: 60 tests @ $22.00/tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1 ,320.00 <br /> 5. Modified Proctor Tests: 3 tests @ $80.00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ <br /> 240.00 <br /> 6. Limerock Bearing Ratio (LBR) Tests: 2 tests @ $ 250.00 . . . . . . . . . . . . . . . . . . . . . . . . . . $500 .00 <br /> 7. Engineering Technician (sampling and standby time allocation, as needed): <br /> Estimate 6 hours @ $42.001hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . $ 252.00 <br /> 8. Asphalt Extraction and Gradation Tests: 1 test @ $90.00/test. . . . . . . . . . . . . . . . . . . . . . . . $ 90.00 <br /> 9. Asphalt Marshall Stability and Flow: 1 test @ $90 .00/test . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 90.00 <br /> 10. Project Engineer: 2 hours @ $98.00/hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . $ 196.00 <br /> Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . $ 3,065.00 <br /> TERMS AND CONDITIONS <br /> This proposal is subject to the following terms and conditions: ( 1 ) access to testing locations is to be readily <br /> available to our field personnel, (2) the proposed number tests and the associated depths will be adequate, <br /> (3) undisturbed samples and consolidation tests on fine grained soils are not budgeted into the total cost and <br /> (4) Ardaman & Associates cannot take responsibility for damages to underground structu res and/or services; <br /> their locations are to be provided by the client prior to commencement of the field work. <br /> CLOSURE <br /> We appreciate the opportunity to submit this proposal and look forward to working with you on this project. <br /> If this proposal meets with your approval , please indicate your acceptance by issuing the work order that will <br /> be assigned to this project. Please call if you have any questions or require additional information. <br /> Sincerely, <br /> ARDAMAN & ASSOCIATES, INC. <br /> _t <br /> Dan J . Zrallack, P. E . <br /> Branch Manager <br />