Laserfiche WebLink
Mr. Himanshu Mehta, P.E. <br /> 19 June 2007 <br /> Page 5 <br /> Geosyntec will investigate the supply of electric power to the following market alternatives : <br /> • landfill site alone; <br /> • correction facility alone; <br /> • landfill site and electric utility; <br /> • correctional facility and electric utility; <br /> • electric utility alone; and <br /> • other direct uses such as biofuel . <br /> For each of the potential technologies, Geosyntec will evaluate the technical and economic <br /> feasibility of these options for use by SWDD . This will include: <br /> • suitability for the LFG generation rate and composition at the landfill; <br /> • potential air permitting requirements; <br /> • local energy market considerations : <br /> • will the local utility purchase electricity from a LFGTE project, and if so what would <br /> be a likely purchase price; <br /> • will the local utility wheel electricity to a non- adjacent user; and <br /> • is "over the fence" transmission of electricity permitted ; <br /> • proximal potential end-users (including on-site) ; <br /> • a capital cost estimate, including: <br /> • engineering and design; <br /> • developer procurement; <br /> • equipment procurement ; and <br /> xL07I 1 ML70087.doc <br /> engineers I scientists I innovators <br />