My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-257
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 12:23:04 PM
Creation date
9/30/2015 11:01:33 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P . E. <br /> 19 June 2007 <br /> Page 7 <br /> • reviewing proposals received by the IRC Purchasing Department and making our <br /> recommendations regarding the strengths and weaknesses of each proposal as well as our <br /> opinion regarding the most qualified proposer; and <br /> • assisting SWDD in selecting the most qualified entity, including reviewing the Contract <br /> Agreement between IRC and the selected entity. <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Tasks 1 through 4 under Phase 1 <br /> (Procurement Phase) of this proposal is summarized in the following table, and a detailed budget <br /> estimate is provided as Attachment 2 . <br /> Task 1 — General Consulting/Meeting Support/Project Management S20,213 <br /> Task 2 — LFG Generation, Projections and Energy Content $ 201571 <br /> Task 3 — Identify and Quantify Suitable Energy Markets $ 25007 <br /> Task 4 — Preparation of RFP and Support During Procurement $455469 <br /> TOTAL (estimated) $ 111 ,360 <br /> Geosyntec will not exceed the cost estimate without prior approval and written authorization <br /> from SWDD . <br /> SCHEDULE <br /> Geosyntec will be available for a kick-off meeting and site visit within two weeks of <br /> authorization to proceed (ATP) from SWDD . During the kick-off meeting, Geosyntec will <br /> conduct a site visit to inspect the GCCS and recording equipment and collect all necessary data <br /> and information (including flare manufacturer' s operation manual) for review . Task 2 will be <br /> completed within six weeks of ATP . Task 3 will be performed shortly after completion of Task <br /> 2. Geosyntec anticipates issuing the draft project announcement and RFP document, under Task <br /> 4 within six months of ATP . <br /> XL07I 19nL7oo&7.doc <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.