My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-256
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 2:03:30 PM
Creation date
9/30/2015 11:01:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/24/2007
Control Number
2007-256
Agenda Item Number
14.B.5
Entity Name
Geosyntec Consultants
Subject
Work Order No.9 services Borrow Area Permitting
Area
County Landfill
Supplemental fields
SmeadsoftID
6481
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 <br />BUDGET ESTIMATE <br />PROFESSIONAL SERVICES FOR BORROW AREA PERMITTING <br />INDIAN RIVER COUNTY LANDFILL FACILITY <br />TASK 3, PHASE 1:CONSUMPTIVE USE PERMIT MODIFICATION <br />XL07170/JL70146Budget. As Geosyntec Consultants <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />BUDGET <br />a. Principal <br />hr <br />$185 <br />0 <br />$0 <br />b. Associate <br />hr <br />$160 <br />4 <br />$640 <br />c. Senior Professional <br />hr <br />$142 <br />20 <br />52,834 <br />d. Project Professional <br />hr <br />$109 <br />24 <br />$2,609 <br />e. Professional <br />hr <br />$89 <br />0 <br />SO <br />f. Senior Staff Professional <br />hr <br />$82 <br />0 <br />$0 <br />g. Staff Professional <br />hr <br />$68 <br />0 <br />$0 <br />Subtotal Professional Services <br />$6,083 <br />a. Site Manager/Construction Manager <br />hr <br />.$81 <br />0 <br />$0 <br />b. Senior Engineering Technician <br />hr <br />$60 <br />0 <br />$0 <br />c. Engineering Technician <br />hr <br />$47 <br />0 <br />$0 <br />d. Senior CADD Operator <br />hr <br />$91 <br />0 <br />$0 <br />e. Drafter/CADD Operator <br />hr <br />$54 <br />12 <br />$648 <br />f Technical/Administrative Assistant <br />hr <br />$70 <br />0 <br />$0 <br />g. Technical Word Processor <br />hr <br />$66 <br />0 <br />$0 <br />h. Clerical <br />hr <br />$42 <br />6 <br />$253 <br />Subtotal Technical/Administrative Services <br />$902 <br />1 11,7777777 <br />a. Lodging <br />day <br />$100 <br />0 <br />$0 <br />b. Per Diem <br />day <br />$21 <br />0 <br />SO <br />c. Communications Fee <br />3% labor <br />0.03 <br />$6.984 <br />$210 <br />d. CADD Computer System <br />hr <br />$15 <br />12 <br />$180 <br />e. Vehicle Rental <br />day <br />$75 <br />0 <br />$0 <br />f. 8.5'x11" Photocopies <br />each <br />$0.12 <br />200 <br />S24 <br />g. CADD Photocopies <br />each <br />$3 <br />20 <br />$60 <br />Subtotal Reimbursables <br />$474 <br />3_.. fir, fir.W.S'11�1E tj <br />$7,458` <br />XL07170/JL70146Budget. As Geosyntec Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.