Laserfiche WebLink
IRC Work Order #9E <br /> CR 512 PH3 R/W Map <br /> 9/6/2006 <br /> Page 4 of 5 <br /> EXHIBIT "A" <br /> INDIAN RIVER COUNTY <br /> RIGHT OF WAY MAP CHECKLIST <br /> All Right-of-way projects shall adhere to Chapter 177 & 472 , F.S. and <br /> Chapter 61G17, F.A.C. as minimum and be certified as such. <br /> 1 . Cover sheet/Key sheet. <br /> 2 . Survey notes and report sheet (As applicable) <br /> 3 . Survey Control sheet (As applicable and or necessary) <br /> 4. Subsequent R/W map sheets. <br /> 5 . Supply a Box or area for COUNTY acceptance and/or certification. <br /> 6 . Title Box of each sheet must contain: <br /> a. COUNTY <br /> b. State Road Number <br /> c. Designed, drawn and checked by (use names or initials) & date <br /> d. Scale <br /> e. Field Book References <br /> f. Sheet Numbers to be in numerical order ( 1 , 2, 3 , 49 etc.) NOT ( 1 , IA, 1B, <br /> 2, etc.) <br /> 7. Any notes necessary to set out the type and/or purpose of the map shall be shown. <br /> 8 . Show pertinent dimensions and bearings in the following fashion as the case may <br /> be: <br /> a. Plat — (P) <br /> b. Computed — (C) <br /> c. Field — (F) <br /> d. Deed (D) <br /> 9. Table of Ownerships shall show: <br /> a. Parcel Number <br /> b. Owners Name <br /> c. Recording Data <br /> 10. Show stations and offsets to all Right of Way Breaks. <br /> 11 . Establish a baseline alignment for control and determine location of significant <br /> elements for future monumentation. <br /> 12. Verify that computed distances and bearings are supported by field <br /> measurements. <br /> 13 . Intentionally omitted — to be included in future contract. <br /> 14. Ensure that significant elements of all curves are shown and are correct. Also <br /> show curve data on all sheets where they appear. <br /> 15 . Begin and End R/W Project with Stations. <br /> 16. Stationing in field minimum 500 ' beyond beginning and ending of project. <br />