Laserfiche WebLink
Attachment 3 — Timeframe <br /> WABASSO BEACH PARK RESTORATION <br /> Estimated Time <br /> for Completion May 27 , 2006 <br /> ( # of days from NTP) Task Description <br /> Task 1 - .Desi n <br /> 42 1 . 1 Arrange for Soil Borings by COUNTY <br /> 1 . 1 Preliminary Design - Boardwalk & Dune Vegetation <br /> 1 . 1 Preliminary Design - Water & Sewer Services Conn . <br /> 1 . 1 Preliminary Design - Paving & grading <br /> 1 . 1 Prelimina Design - Storm Profiles & Wave Loads <br /> 1 . 1 Preliminary Design - meeting with COUNTY <br /> 210 1 . 2 Final Design - Site Plan <br /> - 1 . 2 Final Design - Coordination with Architect <br /> 1 . 2 Final Design - Boardwalk & Dune Vegetation <br /> 1 . 2 Final Design - Water & Sewer Services Conn. <br /> 1 . 2 Final Desi in - Paving & grading <br /> 1 . 2 Final Design - Technical Specs <br /> 03. 11D, <br /> esi n - 0 inion of Probable Costs <br /> al Desi n - meet with COUNTY <br /> te. Plan A " royal <br /> as scheduled C meetin s - u to 2 meetin s <br /> mitApplication - - - <br /> 14 A litiCfce <br /> 56 prepare permit application <br /> 3. 3 Permit Processing - follow up w / FDEPstaff <br /> 189 3. 3 Permit Processing - 2 RAIs <br /> Task 41RC Utility Application <br /> 49 4. 1 FDEP/FDOTPermitApplication <br /> 139 4. 2 FDEP/FDOTPermit Processing <br /> Task 5 Bidding & Construction Phase Services <br /> 231 5. 1 Bidder's Questions and Addenda <br /> 252 5. 2 Bid Evaluation & Contact Aw and <br />