Laserfiche WebLink
A TRUE CO Y � / l 0 I � � <br /> SECTION 00530 - EJCDC CERTIFICATION ON LAST PAGE <br /> J . K . BARTON , CLERK <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ( "Agreement " or " Contract " ) , dated the 16 day of November in the year 2010 <br /> by and between Indian River County , a political subdivision of the State of Florida ( hereinafter <br /> called OWNER ) and Summit Construction Management Inc . . ( hereinafter called CONTRACTOR ) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor , material , and equipment to perform the work as specified or indicated in <br /> the Contract Documents . The work is generally described as follows : <br /> A . CONTRACTOR shall complete all work as specified or indicated in the Contract <br /> Documents . The work is generally described as follows which shall include , but is not <br /> necessarily limited to the following . <br /> Indian River County ( IRC ) proposes to construct a 3 . 0 million gallon above - <br /> ground reuse water storage tank , a pre -fabricated pump station building , <br /> and related 16 " yard piping as part of the North County Reuse Expansion . <br /> The yard piping will connect to 16 " reuse mains in the 77th Street right-of- <br /> way ( to be constructed by others ) . The reuse water storage tank and <br /> pumping station site will be developed with a paved driveway and parking , <br /> sidewalks , and stormwater management system . <br /> The project consists of, but is not limited to : utilities exploration , <br /> coordination with permitting agencies , trenching , dewatering , installation of <br /> pipe with fittings and all appurtenances ; valves , pipe joint restrainers , soil <br /> compaction , testing , electromagnetic flow meters , SCADA system , 3 . 0 <br /> million gallon above -ground pre -stressed concrete reuse water storage <br /> tank , pre -fabricated pump station building , high -service pumps , asphalt <br /> paving , concrete sidewalks , landscape , irrigation , stormwater structures , <br /> and piping , restoration , traffic control , and all else incidental thereto . <br /> B . The OWNER shall have the option of direct purchase of all material and equipment for the <br /> project in accordance with Rule 12A- 1 - 094 of the Florida Administrative Code . The <br /> contractor will be responsible for preparing the purchase documents for purchasing by the <br /> owner . The contractor will be responsible for scheduling , receiving , handling , and storage <br /> of all direct purchase material and equipment . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Masteller & Moler , Inc . , hereinafter called ENGINEER , and who <br /> is to act as OWNER' S representative , assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents , <br /> 00530- 1 <br /> F: \Utilities\ UTILITY - EMPLOYEE FOLDERS\Larry Brown\Reuse Tank Agreement summit. doc <br />