My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-267
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2016 1:33:09 PM
Creation date
10/1/2015 2:32:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/19/2010
Control Number
2010-267
Agenda Item Number
12.J.2
Entity Name
Summit Construction Management Inc.
Subject
agreement 3.0 MG ground reuse water storage tank & pumping Facilities
Area
77th Street Right of Way
Supplemental fields
SmeadsoftID
9856
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A I taut UUF' Y - <br /> CERTIFICATION ON LAST PAGE <br /> J . K . BARTON , CLERK <br /> 7 . 2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary <br /> Conditions as provided in Paragraph 4 . 02 of the General Conditions , and accepts the <br /> determination set forth in Paragraph SC -4 . 02 of the Supplementary Conditions of the <br /> extent of the technical data contained in such reports and drawings upon which <br /> CONTRACTOR is entitled to rely . <br /> 7 . 3 CONTRACTOR has obtained and carefully studied ( or assumes responsibility for obtaining <br /> and carefully studying ) all such examinations , investigations , explorations , tests , reports <br /> and studies ( in addition to or to supplement those referred to in Paragraph 7 . 2 above ) <br /> which pertain to the subsurface or physical conditions at or contiguous to the site <br /> or <br /> otherwise may affect the cost , progress , performance or furnishing of the work as <br /> CONTRACTOR considers necessary for the performance of furnishing of the work at the <br /> Contract Price , within the Contract Time and in accordance with the other terms and <br /> conditions of the Contract Documents , including specifically the provisions of Paragraph <br /> 4 . 02 of the General Conditions ; and no additional examinations , investigations , <br /> explorations , tests , reports , studies or similar information or data are or will be required by <br /> CONTRACTOR for such purposes . <br /> 7 . 4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br /> the Contract Documents with respect to existing underground facilities at or contiguous to <br /> the site and assumes responsibility for the accurate location of said underground facilities . <br /> No additional examinations , investigations , explorations , tests , reports , studies or similar <br /> information or data in respect of said underground facilities are or will be required by <br /> CONTRACTOR in order to perform and furnish the work at the Contract Price , within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents , including specifically the provisions of Paragraph 4 . 04 of the General <br /> Conditions . <br /> 7 . 5 CONTRACTOR has correlated the results of all such observations , examinations , <br /> investigations , explorations , tests , reports and studies with the terms and conditions of the <br /> Contract Documents , <br /> 7 . 6 CONTRACTOR has given ENGINEER written notice of all conflicts , errors or discrepancies <br /> that he has discovered in the Contract Documents and the written resolution thereof by <br /> ENGINEER is acceptable to CONTRACTOR . <br /> ARTICLE 8 CONTRACT DOCUMENTS . <br /> The Contract Documents which comprise the entire agreement between OWNER and <br /> CONTRACTOR concerning the work consist of the following : <br /> 8 . 1 This Agreement ( Section 00530 ) . <br /> 8 . 2 Public Construction Bonds ( Section 00610 ) . <br /> 8 . 3 Notice of Award and Notice to Proceed ( examples in Section 00800 ) . <br /> 8 . 4 General Conditions ( Section 00700 ) . <br /> 8 . 5 Supplementary Conditions ( Section 00800 ) . <br /> 00530 - 5 <br /> R\Utilities\UTILITY - EMPLOYEE FOLDERS\Larry Brown\Reuse Tank Agreement summit . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.