66th Avenue Phase 2 Roadway Improvements
Subject
Work Order 2
Area
66th Avenue
Supplemental fields
SmeadsoftID
9576
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> EXHIBIT 63 ' <br /> TIME SCHEDULE <br /> WORK ORDER NO . 2 <br /> The following timeline is projected after the Notice to Proceed is issued by the COUNTY : <br /> Task 1 Design Survey: (0- 15 days) <br /> Survey information downloaded within 15 days after Notice to Proceed . <br /> Task 2 Coordination with Public Works Department : ( 15 — 60 days) <br /> Coordination shall coincide with construction plans and specifications . <br /> Task 3 Construction Plans and Specifications : ( 15 — 60 days) <br /> Construction plans and specifications completed 45 days after completion of Survey. <br /> Task 4 Pennitting Exemption : ( 60- 90 days) <br /> Permit exemption request submitted after completion of Constriction Plans and <br /> Specifications . Permit exemption estimated to be issued within 30 days of submittal . <br /> Task 5 Construction Administration : (ongoing) <br /> Constriction administration shall be provided during conflict installation only. Schedule <br /> based on length of roadway constriction project . <br /> Task 6 Constriction Inspection : (ongoing) <br /> Construction inspection shall be provided during conflict installation only. Schedule <br /> based on length of roadway construction project . <br /> Task 7 As -Built Drawing : (upon completion of conflict installations) <br /> "As -built" drawing will be performed during and immediately after submission of water <br /> main conflict "as-built ' data . <br /> Page 6 of 6 <br />