My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:17:58 PM
Creation date
10/1/2015 4:08:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021A
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contractor
Subject
Contract Documents and Specifications
Culvert Replacement
Area
6th Ave. SW North of 23rd. St. SW
Project Number
1136
Bid Number
2012033
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of utility owners or other contractors performing other ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> work as contemplated by Article 7 , fires , floods , CORRECTION , REMOVAL OR ACCEPTANCE OF <br /> epidemics , abnormal weather conditions , or acts of DEFECTIVE WORK <br /> God . <br /> 12 . 04 Delays Within CONTRACTOR 's Control 13 . 01 Notice of Defects <br /> A . The Contract Times (or Milestones ) will not be A . Prompt notice of all defective Work of which <br /> extended due to delays within the control of OWNER or ENGINEER has actual knowledge will be <br /> CONTRACTOR . Delays attributable to and within the given to CONTRACTOR . All defective Work may be <br /> control of a Subcontractor or Supplier shall be rejected , corrected , or accepted as provided in this <br /> deemed to be delays within the control of CONTRA& Article 13 . <br /> TOR . <br /> 13 . 02 Access to Work <br /> 12 . 05 Delays Beyond OWNER 's and <br /> CONTRACTOR 's Control A. OWNER , ENGINEER , ENGINEER 's Con - <br /> sultants , other representatives and personnel of <br /> A . Where CONTRACTOR is prevented from OWNER , independent testing laboratories , and <br /> completing any part of the Work within the Contract governmental agencies with jurisdictional interests will <br /> Times (or Milestones ) due to delay beyond the control have access to the Site and the Work at reasonable <br /> of both OWNER and CONTRACTOR , an extension of times for their observation , inspecting , and testing . <br /> the Contract Times (or Milestones ) in an amount CONTRACTOR shall provide them proper and safe <br /> equal to the time lost due to such delay shall be conditions for such access and advise them of <br /> CONTRACTOR 's sole and exclusive remedy for such CONTRACTOR's Site safety procedures and <br /> delay . programs so that they may comply therewith as <br /> - - - - - _ _ - - ---- - -- --- --- -_ applicable.--- - <br /> 12 . 06 Delay Damages <br /> 13 . 03 Tests and Inspections <br /> A . In no event shall OWNER or ENGINEER be <br /> liable to CONTRACTOR , any Subcontractor , any A . CONTRACTOR shall give ENGINEER timely <br /> Supplier, or any other person or organization , or to any notice of readiness of the Work for all required <br /> surety for or employee or agent of any of them , for inspections , tests , or approvals and shall <br /> cooperate <br /> damages arising out of or resulting from : with inspection and testing personnel to facilitate <br /> required inspections or tests . <br /> 1 . delays caused by or within the control <br /> of CONTRACTOR ; or B . OWNER shall empley and— pay fer the <br /> conii�o� Of -ten indepeR & Rt tocfnn ni }ri <br /> .. .. �. f,v„�.,v„ z .�cr.--r�yetiCtcFttiT J L <br /> 2 , delays beyond the control of both <br /> OWNER and CONTRACTOR including but not <br /> limited to fires , floods , epidemics , abnormal <br /> weather conditions , acts of God , or acts or <br /> neglect by utility owners or other contractors . <br /> performing other work as contemplated by below; <br /> Article 7 . <br /> 2 . that GGStS iRGUFred in G9RReGti9R with <br /> B . Nothing in this paragraph 12 . 06 bars a <br /> change in Contract Price pursuant to this Article 12 to paragraph 131041 �R Sh ;�; Il be paid as provided iR <br /> compensate CONTRACTOR due to delay, said PaFagpaph 13 . 04 . 130; apd <br /> interference , or disruption directly attributable to <br /> actions or inactions of OWNER or anyone for whom <br /> OWNER is responsible . th8 G9R #aGt DGGHMIBIRtS . <br /> C . If Laws or Regulations of any public body <br /> having jurisdiction require any Work (or part thereof) <br /> specifically to be inspected , tested , or approved by an <br /> employee or other representative of such public body, <br /> CONTRACTOR shall assume full responsibility for <br /> arranging and obtaining such inspections , tests , or <br /> approvals , pay all costs in connection therewith , and <br /> 00700 - General Conditions REV 04-07 .doc <br /> 00700 - 34 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1136-6th Ave SW—Culvert Replacement N of 23rd St SW Admim\Contract Documents\00700 - General Conditions <br /> REV 04-07 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.