My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:17:58 PM
Creation date
10/1/2015 4:08:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021A
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contractor
Subject
Contract Documents and Specifications
Culvert Replacement
Area
6th Ave. SW North of 23rd. St. SW
Project Number
1136
Bid Number
2012033
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
calendar week , even though such overtime work may be required under <br /> emergency conditions and may be ordered by the ENGINEER in writing . <br /> 4 . All costs of inspection and testing performed during overtime work by the <br /> CONTRACTOR , which is allowed solely for the convenience of the <br /> CONTRACTOR , shall be borne by the CONTRACTOR , and a credit given to the <br /> OWNER to deduct the costs of all such inspection and testing from any <br /> payments otherwise due the CONTRACTOR . <br /> 5 . All costs of OWNER Is employees and costs of ENGINEER ' s Consultant resulting <br /> from overtime work by the CONTRACTOR , which is allowed solely for the <br /> convenience of the CONTRACTOR , shall be borne by the CONTRACTOR , and a <br /> credit given to OWNER to deduct all such costs from any payments otherwise <br /> due the CONTRACTOR . <br /> 6 . No work shall commence before 7 a . m . or continue after 5 p . m . except in case of <br /> emergency upon specific permission of the ENGINEER . <br /> SC -6 . 06 Concerning Subcontractors , Suppliers , and Others <br /> SC -6 . 06 . C . Add the following sentence at the end of paragraph GC- 6. 06. C: <br /> OWNER or ENGINEER may furnish to any such Subcontractor , Supplier, or other individual or <br /> entity , to the extent practicable , information about amounts paid to CONTRACTOR on <br /> account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or <br /> other individual or entity . <br /> SC -6 . 08 Permits <br /> SC -6 . 08 Add the following paragraphs immediately after paragraph GC- 6. 08. A : <br /> 1 . The OWNER has obtained the following permits ( copies of these permits are <br /> contained in Appendix "A" ) : <br /> A . Indian River Farms Water Control District — Permit no . 11 - 32 <br /> 2 , The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses . The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER . <br /> 3 , The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements . The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with . <br /> SC - 13 . 03 Test and Inspections <br /> SC- 13 . 03 . 13 . Delete the first sentence of paragraph GC- 13. 03. 8 in its entirety, and insert <br />the <br /> following sentences in its place : <br /> B . OWNER shall employ and pay for the services of an independent testing <br /> laboratory to perform all initial inspections , tests , or approvals required by the <br /> Contract Documents except those inspections , tests , or approvals listed <br /> 00800-6 <br /> 00800 - Supplementary Conditions 06-09 rev . doc <br /> 00800 6F\Public Works\ENGINEERING DIVISION PROJECTS\ 1136-61h Ave SW_Culveri Replacement N of 23rd St SWV\dmim\Conlract Documents\00800 <br /> Supplementary Conditions 06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.