My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:17:58 PM
Creation date
10/1/2015 4:08:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021A
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contractor
Subject
Contract Documents and Specifications
Culvert Replacement
Area
6th Ave. SW North of 23rd. St. SW
Project Number
1136
Bid Number
2012033
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A . Protect existing trees , shrubs and plants on or adjacent to the site that are <br /> shown or designated to remain in place against unnecessary cutting , breaking or <br /> skinning of trunk , branches , bark or roots . <br /> B . Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas <br /> subject to traffic . <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet . Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> mechanical damage and damage by erosion , flooding , run -off or noxious <br /> materials in solution . <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality . <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> 1 . 4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements , which could be damaged by <br /> construction activities . The CONTRACTOR shall repair any irrigation systems <br /> damaged by construction activities within two ( 2 ) days . Irrigation systems <br /> partially within the right- of-way of 6th Avenue S . W . and all intersecting side <br /> streets within project limits may be cut off and capped or connected to same <br /> system to maintain functionality . The CONTRACTOR shall be responsible for <br /> maintaining the functionality of the remaining portion of the system if it should fall <br /> outside of the right-of-way . <br /> 01541 -2 <br /> F : \ Public Works \ ENGINEERING DIVISION PROJECTS\ 1136-6th Ave SW—Culvert Replacement N of 23rd St <br /> SW \Adrnim \Contract Documents\01541 - Protection of Property . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.