Laserfiche WebLink
C . TRAFFIC CONTROL - STANDARDS : The FDOT Design Standards For Design <br /> Construction , Maintenance and Utility Operations On The State Highway System , <br /> Edition as dated on the plans set forth the basic principles and prescribes minimum <br /> standards to be followed in the design , application , installation , maintenance and <br /> removal of all traffic control devices and all warning devices and barriers which are <br /> necessary to protect the public and workmen from hazards within the project limits . <br /> The standards established in the aforementioned manual constitute the minimum <br /> requirements for normal conditions , and additional traffic control devices warning <br /> devices , barriers or other safety devices will be required where unusual , complex or <br /> particularly hazardous conditions exist . <br /> The above referenced standards were developed using F . H . W . A . , U . S . D . O . T . <br /> Manual on Uniform Traffic Control Devices ( MUTCD ) . <br /> D . TRAFFIC CONTROL DEVICES WARNING DEVICES AND BARRIERS - <br /> INSTALLATION : The responsibility for installation and maintenance of adequate <br /> traffic control devices , warning devices and barriers , for the protection of the travel <br /> in public and workmen , as well as to safeguard the work area in general shall rest <br /> with the Contractor . Consideration shall be given to recommendations of the <br /> Engineer . The required traffic control devices , warning devices and barriers shall be <br /> erected by the Contractor prior to creation of any hazardous condition and in <br /> conjunction with any necessary re - routing of traffic . The Contractor shall <br /> immediately remove , turn or cover any devices or barriers which do not apply to <br /> existing conditions . All traffic control devices shall conform to MUTCD standards <br /> and shall be clean and relatively undamaged . Damaged devices diminishing <br /> legibility and recognition , during either night or day conditions , are not acceptable <br /> for use . <br /> E . NO WAIVER OF LIABILITY : The Contractor shall conduct his operations in such a <br /> manner that no undue hazard will result due to the requirements of this article , and <br /> the procedures and policies described therein shall in no way act as a waiver of any <br /> of the terms of the liability of the Contractor or his surety . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under : <br /> Bid Item No . 102 - 1 - Maintenance of Traffic - Lump Sum <br /> 01025- 3 Technical Specifications <br /> F :\Public Works\ ENGINEERING DIVISION PROJECTS\ 1136 -6th Ave SW_ Culvert Replacement N of 23rd St SW \Admim\Contract <br /> Documents\Technical Specifications . doc <br />