Laserfiche WebLink
scarified or loosened to a depth and then raked smooth and free from debris . Where <br /> the soil is sufficiently loose and clean , the Owner , at his discretion , may authorize the <br /> elimination of ground preparation . <br /> G . Application of Fertilizer : Before applying fertilizer, the soil pH shall be brought to a <br /> range of 6 . 0 - 7 . 0 . <br /> Contractor shall apply two ( 2 ) applications . The initial shall be fertilizer and the second <br /> application shall be " weed and feed " . <br /> The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds <br /> per acre , or 10 pounds per 1 , 000 square feet , by a spreading device capable of <br /> uniformly distributing the material at the specified rate . <br /> Contractor shall apply applications as per manufacturer's specification . All tickets from <br /> bags shall be handed over to the County Inspector . <br /> On steep slopes , where the use of a machine for spreading or mixing is not <br /> practicable , the fertilizer shall be spread by hand and raked in and thoroughly mixed <br /> with the soil to a depth of approximately 2 inches . <br /> H . Placing Sod : The sod shall be placed on the prepared surface , with edges in close <br /> contact and shall be firmly and smoothly embedded by light tamping with appropriate <br /> tools . _ <br /> Where sodding is used in drainage ditches , the setting of the pieces shall be staggered <br /> so as to avoid a continuous seam along the line of flow . Along the edges of such <br /> staggered areas , the offsets of individual strips shall not exceed 6 inches . In order to <br /> prevent erosion caused by vertical edges at the outer limits , the outer pieces of sod <br /> shall be tamped so as to produce a featheredge effect . <br /> Where sodding is placed abutting paved shoulder , the contractor is to ensure that the <br /> finished sod elevation is 1 '/2" below paved shoulder . <br /> On slopes greater than 3 : 1 , the Contractor shall prevent the sod from sliding by means <br /> of wooden pegs driven through the sod blocks into firm earth , at suitable intervals . <br /> Sodding shall not be performed when weather and soil conditions are , in the <br /> Engineer' s opinion , unsuitable for proper results . <br /> Sod shall be placed around all structures , equipment pads , etc . <br /> I . Watering : The areas on which the sod is to be placed shall contain sufficient moisture , <br /> as determined by the Engineer, for optimum results . After being placed , the sod shall <br /> be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks . <br /> Thereafter , the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days ( or until final acceptance , whichever is latest ) . <br /> J . Maintenance : The Contractor shall , at his expense , maintain the sodded areas in a <br /> satisfactory condition until final acceptance of the project . Such maintenance shall <br /> include repairing of any damaged areas and replacing areas in which the establishment <br /> of the grass stand does not appear to be developing satisfactorily . <br /> Replanting or repair necessary due to the Contractor' s negligence , carelessness or <br /> 01025- 24 Technical Specifications <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\ 1136-6th Ave SW--Culvert Replacement N of 23rd St SW\Admim\Contract <br /> Documents\Technical Specifications . doc <br />