Laserfiche WebLink
safety and protection of such Underground upon or make any Claire against OWNER , <br /> Facility. ENGINEER or any of ENGINEER's Consultants with <br /> respect to : <br /> 2 . If ENGINEER concludes that a <br /> change in the Contract Documents is required , 1 . the completeness of such reports <br /> a Work Change Directive or a Change Order and drawings for CONTRACTOR's purposes , <br /> will be issued to reflect and document such including , but not limited to , any aspects of the <br /> consequences . An equitable adjustment shall means , methods , techniques , sequences and <br /> be made in the Contract Price or Contract procedures of construction to be employed by <br /> Times , or both , to the extent that they are CONTRACTOR and safety precautions and <br /> attributable to the existence or location of any programs incident thereto ; or <br /> Underground Facility that was not shown or <br /> indicated or not shown or indicated with 2 , other data , interpretations , opinions <br /> reasonable accuracy in the Contract and information contained in such reports or <br /> Documents and that CONTRACTOR did not shown or indicated in such drawings ; or <br /> know of and could not reasonably have been <br /> expected to be aware of or to have anticipated . 3 . any CONTRACTOR interpretation of <br /> If OWNER and CONTRACTOR are unable to or conclusion drawn from any "technical data" <br /> agree on entitlement to or on the amount or or any such other data , interpretations , opinions <br /> extent , if any, of any such adjustment in or information . <br /> Contract Price or Contract Times , OWNER or <br /> CONTRACTOR may make a Claim therefor as C . CONTRACTOR shall not be responsible for <br /> provided in paragraph 10 . 05 . any Hazardous Environmental Condition uncovered or <br /> revealed at the Site which was not shown or indicated <br /> 4 . 05 Reference Points in Drawings or Specifications or identified in the <br /> Contract Documents to be within the scope of the <br /> A. OWNER shall provide engineering surveys to Work . CONTRACTOR shall be responsible for a <br /> establish reference points for construction which in Hazardous Environmental Condition created with any <br /> ENGINEER's judgment are necessary to enable materials brought to the Site by CONTRACTOR , <br /> CONTRACTOR to proceed with the Work . CON - Subcontractors , Suppliers , or anyone else for whom <br /> TRACTOR shall be responsible for laying out the CONTRACTOR is responsible . <br /> Work , shall protect and preserve the established <br /> reference points and property monuments , and shall D . If CONTRACTOR encounters a Hazardous <br /> make no changes or relocations without the prior Environmental Condition or if CONTRACTOR or <br /> written approval of OWNER . CONTRACTOR shall anyone for whom CONTRACTOR is responsible <br /> report to ENGINEER whenever any reference point or creates a Hazardous Environmental Condition , <br /> property monument is lost or destroyed or requires CONTRACTOR shall immediately: ( i ) secure or <br /> relocation because of necessary changes in grades or otherwise isolate such condition ; ( ii ) stop all Work in <br /> locations , and shall be responsible for the accurate connection with such condition and in any area <br /> replacement or relocation of such reference points or affected thereby ( except in an emergency as required <br /> property monuments by professionally qualified by paragraph 6 . 16 ) ; and ( iii ) notify OWNER and ENGI - <br /> personnel . NEER (and promptly thereafter confirm such notice in <br /> writing ) . OWNER shall promptly consult with <br /> 4 . 06 Hazardous Environmental Condition at Site ENGINEER concerning the necessity for OWNER to <br /> retain a qualified expert to evaluate such condition or <br /> A. Reports and Drawings: Reference is made to take corrective action , if any. <br /> the Supplementary Conditions for the identification of <br /> those reports and drawings relating to a Hazardous E . CONTRACTOR shall not be required to <br /> Environmental Condition identified at the Site , if any, resume Work in connection with such condition or in <br /> that have been utilized by the ENGINEER in the any affected area until after OWNER has obtained <br /> preparation of the Contract Documents . any required permits related thereto and delivered to <br /> CONTRACTOR written notice : ( i ) specifying that such <br /> B . Limited Reliance by CONTRACTOR on condition and any affected area is or has been <br /> Technical Data Authorized: CONTRACTOR may rely rendered safe for the resumption of Work ; or ( ii ) <br /> upon the general accuracy of the "technical data " specifying any special conditions under which such <br /> contained in such reports and drawings , but such Work may be resumed safely. If OWNER and <br /> reports and drawings are not Contract Documents . CONTRACTOR cannot agree as to entitlement to or <br /> Such "technical data" is identified in the on the amount or extent , if any, of any adjustment in <br /> Supplementary Conditions . Except for such reliance Contract Price or Contract Times , or both , as a result <br /> on such "technical data , " CONTRACTOR may not rely of such Work stoppage or such special conditions <br /> 00700 - General Conditions REV 04-07 . doc <br /> 00700 - 13 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\ 1 1 36-6th Ave SW—Culvert Replacement N of 23rd Sl SW\Admim\Contract Documents\00700 - General Conditions <br /> REV 04-07 .doc <br />