2 . 07 as it may be adjusted from time to time as <br /> provided below . b . CONTRACTOR certifies that : ( i ) <br /> there is no increase in cost to the OWNER , <br /> 1 . CONTRACTOR shall submit to and ( ii ) it will conform substantially, even <br /> ENGINEER for acceptance (to the extent indi- with deviations , to the detailed requirements <br /> cated in paragraph 2 . 07 ) proposed adjustments of the item named in the Contract <br /> in the progress schedule that will not result in Documents . <br /> changing the Contract Times (or Milestones ) . <br /> Such adjustments will conform generally to the 2 . Substitute Items <br /> progress schedule then in effect and additional - <br /> ly will comply with any provisions of the General a . If in ENGINEER's sole discretion an <br /> Requirements applicable thereto . item of material or equipment proposed by <br /> CONTRACTOR does not qualify as an <br /> 2 . Proposed adjustments in the "or-equal" item under paragraph 6 . 05 . A . 1 , it <br /> progress schedule that will change the Contract will be considered a proposed substitute <br /> Times (or Milestones ) shall be submitted in item . <br /> accordance with the requirements of Article 12 . <br /> Such adjustments may only be made by a b . CONTRACTOR shall submit suffi - <br /> Change Order or Written Amendment in accor- cient information as provided below to allow <br /> dance with Article 12 . ENGINEER to determine that the item of <br /> material or equipment proposed is <br /> 6 . 05 Substitutes and "Or-Equals " essentially equivalent to that named and an <br /> acceptable substitute therefor . Requests for <br /> A . Whenever an item of material or equipment is review of proposed substitute items of <br /> specified or described in the Contract Documents by material or equipment will not be accepted <br /> _using_ the _name_of a proprietary item-or the _name_ of _ a _ _ . _ __ _ by_ ENGINEER fromanyone other than_ ___ ____ _ <br /> particular Supplier , the specification or description is CONTRACTOR . <br /> intended to establish the type , function , appearance , <br /> and quality required . Unless the specification or c . The procedure for review by ENGI - <br /> description contains or is followed by words reading NEER will be as set forth in paragraph <br /> that no like , equivalent , or "or-equal " item or no 6 . 05 .A. 2 . d , as supplemented in the General <br /> substitution is permitted , other items of material or Requirements and as ENGINEER may <br /> equipment or material or equipment of other Suppliers decide is appropriate under the <br /> may be submitted to ENGINEER for review under the circumstances , <br /> circumstances described below . <br /> d . CONTRACTOR shall first make <br /> 1 . "Or-Equal" Items: If in ENGINEER ' s written application to ENGINEER for review <br /> sole discretion an item of material or equipment of a proposed substitute item of material or <br /> proposed by CONTRACTOR is functionally equipment that CONTRACTOR seeks to <br /> equal to that named and sufficiently similar so furnish or use . The application shall certify <br /> that no change in related Work will be required , that the proposed substitute item will <br /> it may be considered by ENGINEER as an perform adequately the functions and <br /> "or-equal " item , in which case review and achieve the results called for by the general <br /> approval of the proposed item may, in design , be similar in substance to that <br /> ENGINEER's sole discretion , be accomplished specified , and be suited to the same use as <br /> without compliance with some or all of the that specified . The application will state the <br /> requirements for approval of proposed substi - extent , if any, to which the use of the <br /> pro- <br /> tute items . For the purposes of this paragraph posed substitute item will prejudice <br /> 6 . 05 .A . 11 a proposed item of material or CONTRACTOR's achievement of Substan - <br /> equipment will be considered functionally equal tial Completion on time , whether or not use <br /> to an item so named if: of the proposed substitute item in the Work <br /> will require a change in any of the Contract <br /> a . in the exercise of reasonable Documents (or in the provisions of any other <br /> judgment ENGINEER determines that : ( i ) it direct contract with OWNER for work on the <br /> is at least equal in quality, durability, Project ) to adapt the design to the proposed <br /> appearance , strength , and design substitute item and whether or not <br /> characteristics ; ( ii ) it will reliably perform at incorporation or use of the proposed substi- <br /> least equally well the function imposed by tute item in connection with the Work is sub - <br /> the design concept of the completed Project ject to payment of any license fee or royalty. <br /> as a functioning whole , and ; All variations of the proposed substitute <br /> 00700 - General Conditions REV 04-07 .doc <br /> 00700 - 19 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\ 1136-6th Ave SW_Culvert Replacement N of 23rd St SWV\dmim\Contract Documents\00700 - General Conditions <br />REV 04-07 . doc <br />