Laserfiche WebLink
3).Headworks Odor control tower repairs : <br /> 1 . Clean & prep odor control tower. <br /> 2 . Cut out, re-fiberglass or re-wet damaged fiberglass matting with vinylester resin . <br /> 3 . Gel-coat odor control tower. <br /> 4 . Remove blower, motor and frame . <br /> 5 . Repair existing frame base with S . S . angle . <br /> 6 . Repair/patch existing concrete pump pad. <br /> 7 . Install blower with S . S . anchors . <br /> 8 . Materials & labor. <br /> 9 . All insurances . <br /> TOTAL PRICE : <br /> Nine thousand, seven hundred dollars and no cents $9.700.00 <br /> 4).Extend chlorine fill lines. <br /> 1 . Extend 2 — 2" chlorine fill lines to corner of slab to accommodate fill truck. <br /> 2 . 40 ' of 2" sch. 80 PVC pipe, S . S . uni-strut, S . S . anchors, S. S . pipe support. <br /> 3 . All materials & labor. <br /> 4 . All insurances. <br /> TOTAL PRICE . <br /> Four hundred fifty dollars and no cents $450.00 <br /> EXCLUDED : Electrical & anything not in scope of work. <br /> If this proposal is acceptable to you, please sign below and return to AM <br /> Construction Group, Inc., and keep the attached copy for your records. <br /> Customer Signature & Printed Name <br /> 2 <br />