My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-049
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 2:22:49 PM
Creation date
10/1/2015 6:00:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
04/15/2014
Control Number
2014-049
Agenda Item Number
8.B.
Entity Name
Acadis US Inc
Subject
Amendment No. 15
Bridge replacements and widening
Area
66th Ave. South of SR 60 and north of 57th St.
Project Number
0545
Alternate Name
Arcadis G & M
Supplemental fields
SmeadsoftID
13082
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Bridge Design Associates, InG) ..... .. . . . .... .... ................. . . .......... ....... $0. 00 $207,222. 00 <br /> Landscape & Irrigation . .......... . ..... . ........................ .. .............. .... . ..... $0. 00 $ 77,160. 00 <br /> (Thomas Lucido & Associates) (Lump Sum) <br /> PondSurveys . ...... . .......................................... ... .. .............. .. . ........... . . $0. 00 $25, 790. 00 <br /> Water Main Plans (ARCADIS) ... ... . ... .. ... . ... . ... ... . .. . . ... .. . . .. . .... .. ..... . $0. 00 $86, 145. 00 <br /> (Lump Sum) <br /> Corridor Study (ARCADIS).. .. ... . .. . ... ... ...... .... ... ... . .... ... .... ... . ... ... . ... $D. DO $15, 581. 00 <br /> CulturalResource Assessment ... . .. . ... .. . .. .... . ... .. . . .. . .... .. .. .. . ... . . . ..... .. $0. 00 $8, 925. 93 <br /> TOTAL PROFESSIONAL SERVICES .. . . ................ ... .. .......... $2, 715. 00 $2, 029,110. 09 <br /> HOUAL YRATE ALLOWANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staling of parcels (375. 00%ach) .......... . . .... NTE $0. 00 $51, 000. DO <br /> Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations ................. ..... ......... NTE $0. 00 $20, 000. 00 <br /> Allowance for Survey Crew andSoft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey $ll2/Hr) .......... . ..... . ..... .... . ....... ........ . . ............... .... ... . ... NTE $0. 00 $20, 000. 00 <br /> Allowance for Survey and Design <br /> Of a transition to match the "isting pavement <br /> At the north end of the project........................... ..................... NTE $0. 00 $270000e00 <br /> Construction Engineering Services - Public Works .... NTE $15, 000. 00 $92, 877. 12 <br /> Construction Engineering Services-Utility Dept ........ . ...... ... NTE $0. 00 $10,446 24 <br /> TOTAL HOURLY RATE ALLOWANCES ............. ..... NTE $15, 000. 00 $221,323. 36 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the <br /> hourly rates listed below. <br /> Project Engineer Manager... . . . . . ..... . . ....................... . ....... $14664 <br /> Project Engineer. ... ....... ......... . ...... . .................... ............... $109 70 <br /> SeniorCADD Operator...... ......... ....................................... $85. 84 <br /> Cadd Draftsman.......................................... . . . ................ weep . $5689 <br /> Page 3 of 5 <br /> G:\LNR Support\A.DMD4\Marketing\Pmposals\WPB\2014\66 th Ave Amendment No 15 4414 .doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.