My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-210
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2016 9:46:40 AM
Creation date
10/1/2015 2:25:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/07/2010
Control Number
2010-210
Agenda Item Number
12.I.1
Entity Name
ACTS,Inc.
Subject
Developer's Agreement Phase 3 Indian River Estates
Roadway improvements
Area
North side of SR 60. south of 26th St.
Supplemental fields
SmeadsoftID
9774
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT QTY UNIT PRICE SCHEDULE <br /> NO . DESCRIPTION VALUE <br /> 5 Storm Sewer <br /> 5 . 1 Type C Inlet EA 0 $2 , 000 . 00 $ 0 . 00 <br /> 5 . 3 Contol Structure Ea 2 $ 3 , 000 . 00 $ 6 , 000 . 00 <br /> 5 . 4 24" 0 RCP LF 0 $ 55 . 00 $ 0 . 00 <br /> 5 . 5 18" 0 RCP LF 0 $ 37 . 00 $ 0 . 00 <br /> 5 . 6 15" O RCP LF 300 $ 32 . 00 $ 91600 . 00 <br /> 5 . 7 Concrete Collar EA 2 $ 800 . 00 $ 1 , 600 . 00 <br /> 5 . 8 Mitered End Section EA 1 $ 500 . 00 $500 . 00 <br /> Sub -total Off-Site Storm Sewer $ 17 ,700 .00 <br /> 6 Cost to Cure r-o-w acquistion items <br /> 6 . 1 re-construct the barbed wire fence LF 11100 $6 . 00 $61600 . 00 <br /> 6 . 2 re-construct the ditch LF 600 $ 8 . 00 $41800 . 00 <br /> 6 . 3 ditch reconnection pipes Each 7 $400 . 00 $ 21800 . 00 <br /> 6 . 4 Parking lot access , 2nd access LS 1 $ 7 , 500 . 00 $ 7 , 500 . 00 <br /> 6 . 5 Restoration LS 1 $ 5 , 000 . 00 $ 5 , 000 . 00 <br /> 6 . 6 Regrade (22 ) furrows to drain north LS 1 $ 8 , 800 . 00 $ 8 , 800 . 00 <br /> Sub-total Cost to Cure $ 35 ,500 .00 <br /> 1 Miscellaneous $479855 . 36 <br /> 2 Pollution Control $61860 . 00 <br /> 3 General Earth Work $ 208 ,672 . 80 <br /> 4 Project Paving and Signalization $ 227 ,651 . 25 <br /> 5 Storm Sewer $ 17 ,700 . 00 <br /> 6 Cost to Cure r-o -w acquistion items $352500 . 00 <br /> CURRENT TOTAL $ 544, 239 . 41 <br /> N: \GAS\P\00-02 IRE 10 Acre\26th street r-o-w\Estimate\26th Street Eng Opinion of Cost_02- 12-2010 . xis Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.