Laserfiche WebLink
UNIT QTY UNIT PRICE SCHEDULEVALUE <br /> NO . DESCRIPTION <br /> 5 Storm Sewer <br /> 5 . 1 Type C Inlet EA 0 $2 , 500 . 00 $ 0 . 00 <br /> 5 . 2 Type J Inlet Ea 0 $ 3 , 000 . 00 <br /> 5 . 3 Contol Structure Ea 1 $ 3 , 000 . 00 $ 3 , 000 . 00 <br /> 5 . 4 24" 0 RCP LF 0 $ 55 . 00 $ 0 . 00 <br /> 5 . 5 18" O RCP LF 0 $ 37 . 00 $ 0 . 00 <br /> 5 . 6 15 O RCP LF 100 $ 32 . 00 $ 3 , 200 . 00 <br /> 5 . 7 Concrete Collar EA 1 $800 . 00 $ 800 . 00 <br /> 5 . 8 Mitered End Section EA 2 $ 500 . 00 $ 1 , 000 . 00 <br /> Sub -total Off-Site Storm Sewerl $ 8 ,000 . 00 <br /> 6 Cost to Cure r-o-w acquistion items <br /> 6 . 1 re-construct the barbed wire fence LF 660 $6 . 00 $ 3 , 960 . 00 <br /> 6 . 2 re-construct the ditch LF 660 $8 . 00 $ 5 , 280 . 00 <br /> 6 . 3 ditch reconnection pipes Each 12 $400 . 00 $4 , 800 . 00 <br /> 6 . 4 Restoration LS 1 $2 , 500 . 00 $2 , 500 . 00 <br /> Sub-total Cost to Cure $ 161540 .00 <br /> 1 Miscellaneous $ 17 , 988 .70 <br /> 2 Pollution Control $1 , 758 .00 <br /> $64 , 130 . 10 <br /> 3 General Earth Work <br /> 4 Project Paving and Signalization $71 ,789 .44 <br /> 5 Storm Sewer $ 8 ,000 .00 <br /> $ 16 , 540 .00 <br /> 6 Cost to Cure r-o -w acquistion items <br /> CURRENT TOTAL $ 1809206 . 25 <br /> N :\GAS\P\00-02 IRE 10 Acre\26th street r-o-w\Estimate\26th Street Eng Opinion of Cost_02-12-2010 . x1s Page 2 of 2 <br />