Laserfiche WebLink
UNIT QTY UNIT PRICE SCHEDULE <br /> NO . DESCRIPTION VALUE <br /> 5 Storm Sewer <br /> 5 . 1 Type C Inlet EA 0 $2 , 500 . 00 $0 . 00 <br /> 5 . 2 Type J Inlet Ea 0 $3 , 000 . 00 $0 . 00 <br /> 5 . 3 Contol Structure Ea 2 $3 , 000 . 00 $6 , 000 . 00 <br /> 5 . 4 24 " 0 RCP LF 0 $55 . 00 $0 . 00 <br /> 5 . 5 18" 0 RCP LF 0 $ 37 . 00 $0 . 00 <br /> 5 . 6 15" 0 RCP LF 300 $ 32 . 00 $ 9 , 600 . 00 <br /> 5 . 7 Concrete Collar EA 2 $ 800 . 00 $ 1 , 600 . 00 <br /> 5 . 8 Mitered End Section EA 2 $ 500 . 00 $ 1 , 000 . 00 <br /> Sub-total Off-Site Storm Sewer $ 18 , 200 . 00 <br /> 6 Cost to Cure r-o-w acquistion items <br /> 6 . 1 re-construct the barbed wire fence LF 11920 $6 . 00 $ 11 , 520 . 00 <br /> 6 . 2 re-construct the ditch LF 11920 $ 8 . 00 $ 151360 . 00 <br /> 6 . 3 ditch reconnection pipes Each 38 $400 . 00 $ 151200 . 00 <br /> 6 . 4 Restoration LS 1 $ 8 , 000 . 00 $8 , 000 . 00 <br /> Sub -total Cost to Cure $ 50 , 080 .00 <br /> 1 Miscellaneous $47 , 370 .06 <br /> 2 Pollution Control $ 6 , 908 . 00 <br /> 3 General Earth Work $ 197 ,657 .20 <br /> 4 Project Paving and Signalization $2361486 . 32 <br /> 5 Storm Sewer $ 183200 .00 <br /> 6 Cost to Cure r-o-w acquistion items $ 503080 . 00 <br /> CURRENT TOTAL $ 556 , 701 . 58 <br /> N : \GAS\P\00-02 IRE 10 Acre\26th street r-o-w\Estimate\26th Street Eng Opinion of Cost_02 - 12-2010 .xis Page 2 of 2 <br />