Laserfiche WebLink
SIDEWALK PROJECT - OLD DIXIE HWY FROM 38TH LN TO 65TH ST aCOM <br /> CONSTRUCTION ENGINEERING AND INSPECTION <br /> SCOPE OF SERVICES <br /> September 19 , 2011 — Revision 2 <br /> AECOM will provide vehicles , laptops and air cards for all field personnel . Costs associated with vehicles and <br /> computer equipment are included in the fee proposal . <br /> Method of Compensation <br /> This section defines the method and limits of compensation to be made to AECOM for the services described in <br /> the scope of services . <br /> This Proposal is based on a Time and Material Basis . The expected construction duration is 160 calendar days . <br /> The proposal includes a part time Senior Project Engineer ( PE ) , a part time Project Administrator, and a full time <br /> Senior Inspector. The part time Senior Project Engineer ( PE) , a part time Project Administrator, and a full time <br /> Senior Inspector will be paid on an hourly rate based on the time spent on the project . <br /> Senior Project Engineer $ 165 . 37 / HR <br /> Project Administrator $ 112 . 44 / HR <br /> Senior Inspector $77 . 82 / HR <br /> Maximum Limitinq Amount Elements <br /> TOTAL CEI COSTS = $ 107, 074. 99 <br /> Task 1 — This task will be based on actual labor hours spent on the task . The estimated hours for this task <br /> are as <br /> follows : <br /> CONTRACT ADMINISTRATION COSTS <br /> Number of Number of Total Number <br /> Description Hourly Rate Hours/Week Work Weeks of Hours Total Cost <br /> Senior Project Engineer $ 165 . 37 3 . 00 2 6 . 00 $ 992 . 22 <br /> Project Administrator $ 112 .44 20 . 00 2 40. 00 $ 4 , 497 . 60 <br /> Senior Project Inspector $ 77 . 82 20 . 00 2 40. 00 $ 31112 . 80 <br /> Estimated Contract Administration Cost = $ 81602. 62 <br /> Task 2 - This task will be based on actual labor hours spent on the task . The estimated hours for this task are <br /> based on the EORs construction time estimate of 23 weeks ( 160 days) . <br /> CONSTRUCTION ADMINISTRATION OBSERVATION TASK 2 <br /> CONSTRUCTION ADMINISTRATION COSTS <br /> Number of Number of Total Number <br /> Description Hourly Rate Hours/Week Work Weeks of Hours Total Cost <br /> Senior Project Engineer $ 165 . 37 2 . 00 19 38 <br /> $ 6, 284 . 06 <br /> Project Administrator $ 112 .44 15 . 00 19 285 <br /> $ 32 , 045 .40 <br /> Senior Project Inspector $ 77 . 82 35 . 00 19 . 5 683 <br /> $ 53 , 112 . 15 <br /> $ <br /> Estimated Construction Administration Costs = $ 91 ,441 . 61 <br /> Page 4 of 5 <br />