My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:03:30 PM
Creation date
10/1/2015 6:00:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/11/2014
Control Number
2014-028C
Agenda Item Number
11.A
Entity Name
Ag Scape Services
Subject
Skeet and Trap Facility Improvements Phase 1
Indian River County Public Shooting Range
Project Number
1213
Bid Number
2014026
Supplemental fields
SmeadsoftID
13087
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR in writing of any negative <br />determination. <br />D. Special Guarantee: OWNER may require <br />CONTRACTOR to furnish at CONTRACTOR's ex- <br />pense a special performance guarantee or other <br />surety with respect to any substitute. <br />E. ENGINEER's Cost Reimbursement: <br />ENGINEER will record time required by ENGINEER <br />and ENGINEER's Consultants in evaluating substitute <br />proposed or submitted by CONTRACTOR pursuant to <br />paragraphs 6 05.A.2 and 6 05.B and in making <br />changes in the Contract Documents (or in the <br />provisions of any other direct contract with OWNER <br />for work on the Project) occasioned thereby. Whether <br />or not ENGINEER approves a substitute item so pro- <br />posed or submitted by CONTRACTOR, CON- <br />TRACTOR shall reimburse OWNER for the charges <br />of ENGINEER and ENGINEER s Consultants for <br />evaluating each such proposed substitute. <br />F. CONTRACTOR's Expense: CONTRACTOR <br />shall provide all data in support of any proposed <br />substitute or "or -equal" at CONTRACTOR's expense. <br />6.06 Concerning Subcontractors, Suppliers, <br />and Others <br />A. CONTRACTOR shall not employ any <br />Subcontractor, Supplier, or other individual or entity <br />(including those acceptable to OWNER as indicated in <br />paragraph 6.06.8), whether initially or as a <br />replacement, against whom OWNER may have <br />reasonable objection. CONTRACTOR shall not be <br />required to employ any Subcontractor, Supplier, or <br />other individual or entity to furnish or perform any of <br />the Work against whom CONTRACTOR has reason- <br />able objection <br />B. If the Supplementary Conditions require the <br />identity of certain Subcontractors, Suppliers, or other <br />individuals or entities to be submitted to OWNER in <br />advance for acceptance by OWNER by a specified <br />date prior to the Effective Date of the Agreement, and <br />if CONTRACTOR has submitted a list thereof in <br />accordance with the Supplementary Conditions, <br />OWNER's acceptance (either in writing or by failing to <br />make written objection thereto by the date indicated <br />for acceptance or objection in the Bidding Documents <br />or the Contract Documents) of any such .Subcon- <br />tractor, Supplier, or other individual or entity so <br />identified may be revoked on the basis of reasonable <br />o bjection after due investigation CONTRACTOR <br />shall submit an acceptable replacement for the <br />rejected Subcontractor, Supplier, or other individual or <br />e ntity, and the Contract Price will be adjusted by the <br />difference in the cost occasioned by such <br />replacement, and an appropriate Change Order will be <br />issued or Written Amendment signed. No acceptance <br />by OWNER of any such Subcontractor, Supplier, or <br />other individual or entity, whether initiallyor as a <br />replacement shall constitute a waiver of any right of <br />OWNER or ENGINEER to reject defective Work. <br />C. CONTRACTOR shall be fully responsible to <br />OWNER and ENGINEER for all acts and omissions of <br />the Subcontractors Suppliers, and other individuals or <br />e ntities performing or furnishing any of the Work just <br />as CONTRACTOR is responsible for <br />CONTRACTOR's own acts and omissions. Nothing in <br />the Contract Documents shall create for the benefit of <br />any such Subcontractor, Supplier, or other individual <br />o r entity any contractual relationship between OWNER <br />o r ENGINEER and any such Subcontractor, Supplier <br />o r other individual or entity, nor shall it create any <br />obligation on the part of OWNER or ENGINEER to <br />pay or to see to the payment of any moneys due any <br />such Subcontractor, Supplier, or other individual or <br />e ntity except as may otherwise be required by Laws <br />and Regulations. <br />D. CONTRACTOR shall be solely responsible <br />for scheduling and coordinating the Work of Subcon- <br />tractors, Suppliers, and other individuals or entities <br />performing or furnishing any of the Work under a <br />direct or indirect contract with CONTRACTOR. <br />E CONTRACTOR shall require all Subcontrac- <br />tors, Suppliers and such other individuals or entities <br />performing or furnishing any of the Work to commu- <br />nicate with ENGINEER through CONTRACTOR. <br />F. The divisions and sections of the Specifica- <br />tions and the identifications of any Drawings shall not <br />control CONTRACTOR in dividing the Work among <br />S ubcontractors or Suppliers or delineating the Work to <br />be performed by any specific trade. <br />G. All Work performed for CONTRACTOR by a <br />S ubcontractor or Supplier will be pursuant to an <br />appropriate agreement between CONTRACTOR and <br />the Subcontractor or Supplier which specifically binds <br />the Subcontractor or Supplier to the applicable terms <br />and conditions of the Contract Documents for the <br />benefit of OWNER and ENGINEER. Whenever any <br />such agreement is with a Subcontractor or Supplier <br />who is listed as an additional insured on the property <br />insurance provided in paragraph 5.06, the agreement <br />between the CONTRACTOR and the Subcontractor <br />o r Supplier will contain provisions whereby the <br />S ubcontractor or Supplier waives all rights against <br />OWNER, CONTRACTOR, ENGINEER, ENGINEER's <br />Consultants, and all other individuals or entities <br />identified in the Supplementary Conditions to be listed <br />as insureds or additional insureds (and the officers <br />directors, partners, employees, agents, and other <br />consultants and subcontractors of each and any of <br />them) for all losses and damages caused by arising <br />o ut of, relating to, or resulting from any of the perils or <br />causes of loss covered by such policies and any other <br />property insurance applicable to the Work. If the <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 20 <br />F:1Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train Bldg\Admim\bid documents\Contract Documents\00700 - <br />General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.