My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:03:30 PM
Creation date
10/1/2015 6:00:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/11/2014
Control Number
2014-028C
Agenda Item Number
11.A
Entity Name
Ag Scape Services
Subject
Skeet and Trap Facility Improvements Phase 1
Indian River County Public Shooting Range
Project Number
1213
Bid Number
2014026
Supplemental fields
SmeadsoftID
13087
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER. ENGINEER's review and <br />approval will be only to determine if the items <br />covered by the submittals will, after installation <br />or incorporation in the Work, conform to the <br />information given in the Contract Documents <br />and be compatible with the design concept of <br />the completed Project as a functioning whole as <br />indicated by the Contract Documents. <br />2. ENGINEER's review and approval <br />will not extend to means, methods, techniques <br />sequences, or procedures of construction <br />(except where a particular means, method, <br />technique, sequence, or procedure of con- <br />struction is specifically and expressly called for <br />by the Contract Documents) or to safety <br />precautions or programs incident thereto. The <br />review and approval of a separate item as such <br />will not indicate approval of the assembly in <br />which the item functions. <br />3. ENGINEER's review and approval of <br />Shop Drawings or Samples shall not relieve <br />CONTRACTOR from responsibility for any <br />variation from the requirements of the Contract <br />Documents unless CONTRACTOR has in <br />writing called ENGINEER s attention to each <br />such variation at the time of each submittal as <br />required by paragraph 6.17.D.3 and ENGI- <br />NEER has given written approval of each such <br />variation by specific written notation thereof <br />incorporated in or accompanying the Shop <br />Drawing or Sample approval, nor will any <br />approval by ENGINEER relieve CON- <br />TRACTOR from responsibility for complying <br />with the requirements of paragraph 6.17.D.1. <br />F. Resubmittal Procedures <br />1. CONTRACTOR shall make correc <br />tions required by ENGINEER and shall return <br />the required number of corrected copies of <br />Shop Drawings and submit as required new <br />Samples for review and approval CON- <br />TRACTOR shall direct specific attention in <br />writing to revisions other than the corrections <br />called for by ENGINEER on previous <br />submittals. <br />6.18 Continuing the Work <br />A. CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule during all disputes or <br />disagreements with OWNER. No Work shall be <br />delayed or postponed pending resolution of any <br />disputes or disagreements except as permitted by <br />paragraph 15 04 or as OWNER and CONTRACTOR <br />may otherwise agree in writing. <br />6.19 CONTRACTOR's General Warranty and <br />Guarantee <br />A. CONTRACTOR warrants and guarantees to <br />OWNER, ENGINEER, and ENGINEER's Consultants <br />that all Work will be in accordance with the Contract <br />Documents and will not be defective <br />CONTRACTOR's warranty and guarantee hereunder <br />excludes defects or damage caused by: <br />1. abuse, modification, or improper <br />maintenance or operation by persons other <br />than CONTRACTOR, Subcontractors, <br />Suppliers, or any other individual or entity .for <br />whom CONTRACTOR is responsible; or <br />2. normal wear and tear under normal <br />usage. <br />B. CONTRACTOR's obligation to perform and <br />complete the Work in accordance with the Contract <br />Documents shall be absolute None of the following <br />will constitute an acceptance of Work that is not in <br />accordance with the Contract Documents or a release <br />of CONTRACTOR's obligation to perform the Work in <br />accordance with the Contract Documents: <br />1. <br />observations by ENGINEER; <br />2. recommendation by ENGINEER or <br />payment by OWNER of any progress or final <br />payment; <br />3. the issuance of a certificate of Sub- <br />stantial Completion by ENGINEER or any <br />payment related thereto by OWNER; <br />4. use or occupancy of the Work or any <br />part thereof by OWNER; <br />5. any acceptance by OWNER or any <br />failure to do so; <br />6. any review and approval of a Shop <br />Drawing or Sample submittal or the issuance of <br />a notice of acceptability by ENGINEER; <br />7. any inspection, test, or approval by <br />others; or <br />8. any correction of defective Work by <br />OWNER. <br />6.20 Indemnification <br />A. To the fullest extent permitted by Laws and <br />Regulations, CONTRACTOR shall indemnify and hold <br />harmless OWNER, ENGINEER, ENGINEER's <br />Consultants, and the officers, directors, partners, <br />employees, agents, and other consultants and <br />subcontractors of each and any of them from and <br />00700 - General Conditions REV 5-10-13.doc <br />00700 - 24 <br />F:\Pubiic Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train Bldg \Hdmim\bid documents\Contract Documents100700 - <br />General Conditions REV 5-10-13 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.