My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:03:30 PM
Creation date
10/1/2015 6:00:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/11/2014
Control Number
2014-028C
Agenda Item Number
11.A
Entity Name
Ag Scape Services
Subject
Skeet and Trap Facility Improvements Phase 1
Indian River County Public Shooting Range
Project Number
1213
Bid Number
2014026
Supplemental fields
SmeadsoftID
13087
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE <br />EFFECTIVE DATE: <br />OWNER Indian River County <br />CONTRACTOR: <br />Project: Indian River County Public Shooting Range — Skeet and Trap Facility Improvements <br />(Phase I) <br />OWNER s Project No. 1213 <br />Engineer's Bid No. 2014026 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />❑ Unit Prices <br />❑ Lump Sum <br />o Other: <br />❑ By Change Order: <br />Estimated increase (decrease) <br />Change Directive <br />Method of determining change in <br />Contract Times <br />O Contractor's Records <br />II Engineer's Records <br />O Other: <br />O By Change Order: <br />of this Work Estimated increase (decrease) in Contract Times. <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase the estimated <br />time is not to be exceeded without further <br />authorization <br />**END OF SECTION** <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train <br />BIdg\Admim\bid documents\Contract Documents\00948 Work Change Directive Rev 06-2013.doc <br />ACCEPTED <br />By: <br />RECOMMENDED <br />By: <br />APPROVED <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />ENGINEER (Signature) <br />Date: <br />OWNER (Signature) <br />Date: <br />**END OF SECTION** <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train <br />BIdg\Admim\bid documents\Contract Documents\00948 Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.