My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028C
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-028C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 3:03:30 PM
Creation date
10/1/2015 6:00:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/11/2014
Control Number
2014-028C
Agenda Item Number
11.A
Entity Name
Ag Scape Services
Subject
Skeet and Trap Facility Improvements Phase 1
Indian River County Public Shooting Range
Project Number
1213
Bid Number
2014026
Supplemental fields
SmeadsoftID
13087
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310 <br />CONSTRUCTION SCHEDULES <br />1.1 GENERAL REQUIREMENTS <br />A. No partial payments shall be approved by the ENGINEER until there is an <br />approved construction progress schedule on hand. <br />B. Designate an authorized representative who shall be responsible for <br />development and maintenance of the schedule and of all progress and <br />payment reports This representative shall have direct project control and <br />complete authority to act on behalf of the CONTRACTOR in fulfilling the <br />commitments of the CONTRACTOR's schedules. <br />1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES <br />When the ENGINEER requires the CONTRACTOR to submit revised (updated) <br />progress schedules on a monthly basis the CONTRACTOR shall: <br />A. Indicate the progress of each activity to the date of submission. <br />B Show changes occurring since the previous submission listing: <br />1. Major changes in scope. <br />2. Activities modified since the previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />Provide a narrative report as needed to define: <br />1. Problem areas anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended and its effect. <br />3. The effect of changes on schedules of other prime contractors. <br />1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br />On or before the tenth day after the effective date of the Agreement, submit the <br />initial schedules to the ENGINEER The ENGINEER will review the schedules and <br />return a review copy to the CONTRACTOR within 21 days after receipt. If required <br />by the ENGINEER, resubmit revised schedules on or before the seventh day after <br />receipt of the review copy. If required by the ENGINEER, submit revised monthly <br />progress schedules with that month's application for payment. <br />01310-1 01310 Construction Schedule <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train <br />Bldg\Admim\bid documents\Contract Documents\01310 - Construction Schedule.doc <br />