Laserfiche WebLink
The determination of the appropriate method(s) of compliance is the complete and sole <br />_responsibility_ of _the_BIDDER__ Such methods_,will...not_ be . checked._by...the_ .OWNER or <br />E NGINEER for accuracy, completeness or any other purpose. The OWNER and <br />E NGINEER shall have no responsibility to review or check the BIDDER's compliance <br />with the Trench Safety Standards. <br />8. The BIDDER, in submitting this bid, represents that it has obtained and considered all <br />available geotechnical information, has utilized said geotechnical information and that <br />based on such information and the BIDDER's own information, the BIDDER has <br />sufficient knowledge of the Project's surface and subsurface site conditions and <br />characteristics to assure BIDDER's compliance with the applicable Trench Safety <br />Standards in designing the trench safety system(s) for the Project <br />STATE OF F/ur'cl.a <br />COUNTY OF d-r4;o/.. gtv°� <br />B I D D E R'i \— Se-/- ✓ r C..2. -S <br />B y: <br />P osition or Title: ` Cc- S <br />D ate: .3/2 /.f i <br />Personally appeared before me, the undersigned authority, �A«/le__ /Si�rr <br />who after first being sworn by me affixed his/her signature in the space provided above on this <br />day of March , 20 /Li . <br />- DEBORAH A CROCKETT <br />MY COMMISSION # EE209841 <br />Notary Public, State at large C : EXPIRES June 1a 2015 <br />My Commission Expires: 5,1z.)aQt� (401)3984153 FFr,>,ld ,ow, <br />**END OF SECTION** <br />00454 - Florida Trench Safety Act - REV 04-07.doc <br />00454 - 2 <br />F:1Public Works\ ENGINEERING DIVISION PROJECTS11213-IRC Shooting Range -Skeet & Trap Improvemnts & Hunters Train Btdg\Admim\bid documents1Contract <br />Documents100454 - Florida Trench Safety Act - REV 04-07.doc <br />