Laserfiche WebLink
A . M . ENGINEERING AND TESTING , INC . <br /> 590 N . W. MERCANTILE PLACE <br /> PORT ST . LUCIE , FLORIDA 34986 <br /> ( 772 ) 924-3575 OFFICE - ( 772 ) 924-3580 FAX <br /> February 10 , 2012 <br /> Indian River County Engineering Department , Stormwater Division <br /> Attn : Keith McCully , P . E . <br /> 1840 25 "' Street <br /> Vero Beach , Florida 32960 <br /> Re : Proposal for Geotechnical Services : <br /> Algal Turf Scrubber System <br /> PC South <br /> Indian River County , Florida <br /> Ladies and Gentlemen : <br /> Per our discussions and correspondence , A . M . Engineering and Testing, Inc . is pleased to submit this <br /> proposal for performing a geotechnical exploration for the referenced project . Based on preliminary plans <br /> and conversations , the project consists of constructing : <br /> I ) A 200 , 000 sf concrete Floway with Influent and Effluent Structures . The Floway will be a <br /> 4 - inch <br /> thick concrete slab , slightly inclined to induce slow water flow, and have a very low tolerance <br /> for <br /> settlement and cracking which would disrupt the water flow and cause project failure . Generally <br /> about 6 to 9 feet of fill would be required to achieve final grade . <br /> 2 ) A 36 , 000 sf Shallow Wetland Polishing System ( lined retention pond) northeast of the Floway . The <br /> planned bottom elevation is + 18 , the ground surface is about + 23 - 24 , and therefore about 5 to <br />6 feet <br /> of cut will be required . <br /> 3 ) A 75 , 200 sf Polishing Pond ( lined retention pond ) east and north of the Shallow Wetland <br />Polishing <br /> System , with a control structure on the north side . The planned bottom elevation is + 1 1 , the <br /> ground <br /> surface is about + 20 - 25 , and therefore about 9 to 14 feet of cut will be required . <br /> 4 ) A 13 , 200 sf solids settling pond ( lined retention pond ) northwest of the Floway structure . The <br /> planned bottom elevation is + 23 which is generally near the existing grade . <br /> After we receive a notice to proceed , we will prepare and submit a project completion schedule . We also will <br /> submit a proposed boring location plan that will include locations for borings , sounding , test pits , <br /> etc . for <br /> review and approval . Once these are approved , field activities will commence . <br /> AM Engineering shall maintain safe working distances around all gopher tortoise and gopher tortoise <br /> borrows identified by County staff. <br /> Page 1 of ') <br />